29 results for collection:ECC

< PREV PAGE OF 2 NEXT >
        
  • (1/11/1963 - 1/12/1963) Surveying land
  • (1/11/1963 - 1/12/1963) Land surveying
  • (1/11/1963 - 1/12/1963) Surveying for dorm
  • (1/11/1963 - 1/12/1963) Bulldozing
  • (2/11/1963 - 2/12/1963) Clearing land for dorm
  • (2/11/1963 - 2/12/1963) Building site for dorm
  • (2/11/1963 - 2/12/1963) Clearing equipment
  • (2/11/1963 - 2/12/1963) Dorm machinery
  • (2/11/1963 - 2/12/1963) Bulldozer
  • (2/20/1963 - 2/21/1963) Gate at Ficklen Stadium
  • (2/20/1963 - 2/21/1963) Bleachers at stadium
  • (4/16/1963 - 4/17/1963) Speed bump sign
  • (4/16/1963 - 4/17/1963) Speed bump
  • (4/16/1963 - 4/17/1963) Driving over speed bump
  • (5/03/1963 - 5/04/1963) Coach Stasavich and Dr. Nephi Jorgenson
  • (5/03/1963 - 5/04/1963) Departmental changes
  • (5/03/1963 - 5/04/1963) Safety Council members
  • (5/03/1963 - 5/04/1963) Safety council
  • (5/03/1963 - 5/04/1963) Safety council
  • (6/06/1963 - 6/07/1963) Fletcher hall
  • (6/06/1963 - 6/07/1963) Construction site
  • (6/06/1963 - 6/07/1963) Dorm construction
  • (6/06/1963 - 6/07/1963) New dorm
  • (6/11/1963 - 6/13/1963) Season ticket holder sign
< PREV PAGE OF 2 NEXT >

This project was partially supported with federal LSTA funds made possible through a grant from the Institute of Museum and Library Services, administered by the State Library of North Carolina, a division of the Department of Cultural Resources.