532 Chronicles of the Cape Fear River VISITS OF THE CRUISER RALEIGH TO THE CAPE FEAR. Soon after the United States steamship Raleigh went into commission, in 1895, she came into the Cape Fear River to receive a service of silver, which was presented to her on be- half of the State by the Hon. Elias Carr, then governor of North Carolina. Later, after our war with Spain, about the first of May, 1899, the Raleigh, returning from the Philippines, commanded by Captain Coghlan, again visited the Cape Fear for the purpose of delivering to the city of Raleigh some trophies of war, including several Spanish cannon, which were formally received by a delegation sent from Raleigh on behalf of the State of North Carolina. The eruiser and her officers and men were honored by an enthuiastic welcome to Wilmington, and Captain Coghlan was deeply touched by his cordial reception. The Raleigh, under the command of Captain Coghlan, had joined in the attack upon the Spanish forts and war vessels in Manila Bay, and our people, desiring to mark this incident by a special compliment, presented another very handsome and valuable service of silver plate to Captain Coghlan and the ship. Mr. William Calder made the presentation speech, and the commander responded in a felicitous address which was long remembered by those who were present. FEDERAL GOVERNMENT IMPROVEMENTS ON UPPER CAPE FEAR RIVER. The present project for the improvement of the upper Cape Fear River was adopted by Congress in the River and Harbor Act of June 25, 1910. This project contemplates an improve- ment by canalization and dredging to obtain a navigable depth of water between Wilmington and Fayetteville, a distance of 115 miles, of eight feet. To accomplish this it is planned to put in two locks and dams. The first lock and dam, known as “Tock and Dam No. 1,” is under construction at King’s Bluff, 39 miles above Wilmington; and the second, or “Lock and Dam No. 2,” is to be located at Brown’s Landing, near Elizabeth- Peace Restored 533 vie 72 miles above Wilmington. The 8-foot channel between ie eS _ King’s Bluff has already been obtained by oo = = is only necessary now to maintain it. The reat : : concrete, with pile foundations and steel-miter- saa ss — e lock at King’s Bluff will be about 294 feet long —— fi a. maximum width at the base of about 84 feet. pesiges : % 28 feet high, and the chamber will take vessels a ee _ ong and 40 feet wide. The dam will be of the oe = ype filled with stone, with sheet-piling above and aes é — be about 275 feet long and 50 feet wide, and = raise the water eight feet above that in the lower part of e river. The abutment for the dam on the side of the river Opposite the lock will be of reinforced concrete pile construc- tion, and will have the same height as the lock walls. As the dam is low, in comparison with the river banks, it will be sub- merged, and its effect as an obstruction in the river will dis- appear by the time the river rises to the top of the bank, so that the area of land covered by water during flood times will be practically the same after the dam is put in as it is now As the lock walls are much higher than the dam, vessels ma , use the lock during a considerable rise in the rie, and tad the river drowns out the lock, there wi e will b f and vessels will pass directly over it. piri cet eens The cofferdam is constructed of steel i teel interlocking piling made by the Lackawanna Steel Company, and is of facies aaa type as was used in the cofferdam for raising the battleship seem Pe a is 45 feet long, and was driven through ace Be : feet of compact sand and thin layers of rock. eee, : 2 pis a back by heavy steel wire cables to pile cere a eet from the wall. In addition to the above Slee a the dredging inside of the cofferdam and the ek aan aia cone se ee ; 1¢ yards of material. Insi sera = bottom was secured about 18 feet below wan 2 — oundation piles is now in progress; this requires sodoos, | of 1,850 piles with a penetration of about 23 feet. - ao concrete will be deposited around the ode oon ‘ A es, the cofferdam will be pumped out, and the eae, t in the dry. Work on the abutment will be ortly and carried on simultaneously with the construc- tion of the ] be beaded gs as soon as these are completed the dam will