Container list
UA06.04.03.01
Buildings, Parking, Walks, undated
UA06.04.04.01
Original Building Blueprints: Austin, Original Dorms, Creamery, undated
UA06.04.04.02
Garage and Coal Bin, Residence, undated
UA06.04.05.01
Auditorium, undated
Box Oversized 1
Planting Bed, Undated
Box Oversized 1
Tree pit retaining wall, Undated
Box Oversized 1
Paul E. Jones Dormitory, Undated
UA06.04.09.01
Misc. Layout, undated
UA06.04.02.01
East Carolina College Development Studies, 1956
UA06.04.02.02
Campus Maps, 1957, 1987, Undated
UA06.04.05.02
topographical map of ECTC, April 25, 1922
UA06.04.05.03
ECTC classroom building
UA06.04.05.04
Human Resources fire alarm upgrade ECU
UA06.04.05.05
Exterior ADA improvments ECU
UA06.04.05.06
ECTC teachers dormitory
UA06.04.05.07
Comm 776 Heath and Physical Ed Building, Comm 777 Workshop and Warehouse, Comm 819 Apt Dorm for Teachers, ECTC
General
D1704, D1705, D 1706
UA06.04.05.08
851 Dorm for 512 men, 840 D1711 Remodeling Existing Dietary Dept.
UA06.04.05.09
Comm 414 ECTC classroom bldg
UA06.04.05.10
Addition to Jones Dormitory, Cafeteria, ECC
UA06.04.05.11
781 Library 1950, 834 1953 men's dormitory, 837 convert old library into music bldg
General
D1707, D1708, D1709
UA06.04.05.12
839 Flanagan Building, dormitory for 520 men
General
D1712, D1713, D1714
UA06.04.05.13
Austin new, ECC
General
DR00311, DR00354ff
UA06.04.05.14
714 classroom bldg ECTC laundry addition and garage, 760 floor ECTC, 799 dorm for teachers, 807 dorm for men
UA06.04.05.15
Dorm for 500 men, comm 885
UA06.04.05.16
Eastern Carolina Cardiovascular Center
UA06.04.05.17
Smart Classroom at Brody 2E-100
UA06.04.05.18
ECU Transit Operations Facility
UA06.04.05.19
Dental Sim Lab at Brody ECU
UA06.04.05.20
Reade Street Market/West End Dining Hall Renovation ECU
UA06.04.05.21
Comm 714 Classroom Building ECTC
UA06.04.05.22
Clement and Greene Fire Suppression System
UA06.04.05.23
Eastern Carolina Cardiovascular Center
UA06.04.05.24
ECU Boiler Controls Upgrade
UA06.04.05.25
ECU Bate Building College of Business Dean's Suite
UA06.04.05.26
Interior Renovations to Dodd Dining Hall ECU
UA06.04.05.27
Bate Building College of Business Student Technology Center
UA06.04.05.28
Java City Joyner Library ECU
UA06.04.05.29
Student Recreation Center ECU
UA06.04.05.30
Cotten and Fleming Hot water
UA06.04.05.31
Floyd Emergency Manhole Repairs
UA06.04.05.32
Howell Science Chilled Water Modifications ECU
UA06.04.05.33
Clement, Greene, and White Roof Replacement ECU
UA06.04.05.34
University Roof Replacement ECU
UA06.04.05.35
Minges HHP Fire Alarm Upgrade
UA06.04.05.36
Warren Life Sciences Building, 2nd floor
UA06.04.05.37
Modifications to Student Plaza Drive
UA06.04.05.38
Eastern Carolina Cardiovascular Institute
UA06.04.05.39
Urology Clinic ECU
UA06.04.05.40
ECTC classroom building
UA06.04.05.41
Phase II Physician's Quadrangle
UA06.04.05.42
ECTC equipment
UA06.04.05.43
Radition Therapy Center Addition
UA06.04.05.44
Radition Therapy Center
UA06.04.05.45
first and second floor of unidentified residence building
UA06.04.05.46
access road to New Dormitory South on 10th Street
UA06.04.05.47
map of campus topographical
UA06.04.05.48
dorm for teachers ECTC
UA06.04.05.49
site plan for Women's Dormitory ECU
UA06.04.05.50
ECC annex
UA06.04.05.51
site plan for 3rd Men's Dormitory, ECC
UA06.04.05.52
Plumbing, Heating, and Electronics Dormitory for 500 students, ECU
UA06.04.05.53
ECU school of Medicine
UA06.04.05.54
ECTC campus
UA06.04.05.55
ECU Wichard Music Bilding
UA06.04.05.56
ECC science building
UA06.04.05.57
ECU classroom building
UA06.04.05.58
ECC dormitory for Women
UA06.04.05.59
ECC heating plant
UA06.04.05.60
ECU school of Medicine
UA06.04.05.61
ECTC dorm for teachers
UA06.04.05.62
ECU school of Medicine
UA06.04.05.63
ECTC location of pipe tunnels
UA06.04.05.64
ECTC workshop and warehouse for maintenance department
UA06.04.05.65
ECTC library, D1707
UA06.04.05.66
ECU College Hill Residence hall phase 1
UA06.04.05.67
East Carolina Cardiovascular Institute, 2009-02-23T00:00:00+00:00
UA06.04.05.68
ECU Addition and Renovation to Wahl-Wats Drama Facility, 1980-11-07T00:00:00+00:00
UA06.04.05.69
ECU Cotton Hall Window and Door Replacement, 2002-07-15T00:00:00+00:00
UA06.04.05.70
ECU storm drain and steam distribution plan, See note
UA06.04.05.71
ECU main campus lighting improvement: storm drain and steam distribution plan, 1990-06-20T00:00:00+00:00
UA06.04.05.72
ECU Classroom Building for Rawl, 1957-11-01T00:00:00+00:00
UA06.04.05.73
ECU school of Medicine, Undated
UA06.04.05.74
ECU Nursing Tower, 1979-06-22T00:00:00+00:00
UA06.04.05.75
Greenville Urology Clinic, 1982-11-08T00:00:00+00:00
UA06.04.05.76
ECTC Gymnasium Addition to Primary School, 1949-05-31T00:00:00+00:00
UA06.04.05.77
Building "M" Physicians Quadrangle Dr. K. Wallace Hospital Drawing, 1973-01-17T00:00:00+00:00
UA06.04.05.78
ECU Health Science Lab, 7/23/99, 1987, undated
UA06.04.05.79
ECU classroom building Austin, 1961-09-02T00:00:00+00:00
UA06.04.05.80
Hospital building?, Undated
UA06.04.05.81
ECTC Training School, 2027-08-20T00:00:00+00:00
UA06.04.05.82
ECTC workshop and warehouse for maintenance department, 1949-11-15T00:00:00+00:00
UA06.04.05.83
ECTC Library, 1950-04-07T00:00:00+00:00
UA06.04.05.84
ECTC girls dormitory, 2023-06-23T00:00:00+00:00
UA06.04.05.85
ECTC teachers dormitory, 1951-03-20T00:00:00+00:00
UA06.04.05.86
ECTC infirmary building, 2029-07-17T00:00:00+00:00
UA06.04.05.87
ECTC teachers dormitory, 1950-06-01T00:00:00+00:00
UA06.04.05.88
ECU science building for biology and physics, 1967-01-26T00:00:00+00:00
UA06.04.05.89
ECTC library plans and drawings, D1707, 1949-07-08T00:00:00+00:00
UA06.04.05.90
ECTC girls dormitory, 1923-06-09T00:00:00+00:00
UA06.04.05.91
Boiler Blowout heat exchanger, 2013-05-31T00:00:00+00:00
UA06.04.05.92
bid documents residence hall mailroom removal, 2016-09-15T00:00:00+00:00
UA06.04.05.93
ECTC mens dormitory, 1948-06-03T00:00:00+00:00
UA06.04.05.94
ECTC teachers dormitory, 1948-03-20T00:00:00+00:00
UA06.04.05.95
ECTC health and physical education building, 1950-06-01T00:00:00+00:00
UA06.04.05.96
ECU Minges/HHP Fire Alarm Upgrade, 2015-02-24T00:00:00+00:00
UA06.04.05.97
Clark Leclair stadium sealant replacement, 2016-11-01T00:00:00+00:00
UA06.04.05.98
Boiler Blowout heat exchanger, 2013-05-31T00:00:00+00:00
UA06.04.05.99
Belk Residence Hall Demolition and Replacement, Vol2, 2017-01-02T00:00:00+00:00
UA06.04.05.100
Belk Residence Hall Demolition and Replacement, Vol 1, 2017-01-02T00:00:00+00:00
UA06.04.05.101
Belk Residence Hall Demolition and Replacement, 2014-02-10T00:00:00+00:00
UA06.04.05.102
ECU school of Dental Medicine 4th floor fit up, 2016-09-02T00:00:00+00:00
UA06.04.05.103
ECU Science and Technology Building, 2001-05-04T00:00:00+00:00
UA06.04.05.104
Belk Residence Hall Demolition and Replacement, 2016-09-20T00:00:00+00:00
UA06.04.05.105
ECTC Topographical Map of Campus
UA06.04.05.106
A map of East Carolina College June 1953
UA06.04.05.107
Laupus Library 1998 and prior
UA06.04.05.108
Student Services Building/Heritage Hall
UA06.04.05.109
ECU main campus parking
UA06.04.05.110
Health Sciences Camping Parking proposed expansion 2005
UA06.04.05.111
Laupus Library
UA06.04.05.112
Aerial photo of campus
UA06.04.05.113
ECC hand drawn campus map
UA06.04.05.114
ECTC or ECC map of campus
UA06.04.05.115
ECTC development plan July 1922, ECTC map March 1946
UA06.04.05.116
topographical map of campus, black
UA06.04.05.117
general classroom building site improvements, 1992-04-29T00:00:00+00:00
UA06.04.05.118
ECU Bio-tech Building, 1988-11-22T00:00:00+00:00
UA06.04.05.119
Greenville Urology Clinic, 1982-11-08T00:00:00+00:00
UA06.04.05.120
Building "M" Physicians Quadrangle Dr. K. Wallace, 1973-05-26T00:00:00+00:00
UA06.04.05.121
ECU Auxiliary Student Supply Store, 1968-10-17T00:00:00+00:00
UA06.04.05.122
ECU Allied Health Professions Building, 1971-03-22T00:00:00+00:00
UA06.04.05.123
ECU faculty offices department of speech-language and auditory pathology, 1993-07-22T00:00:00+00:00
UA06.04.05.124
ECU Athletic Field Development Plan, 1974-09-02T00:00:00+00:00
UA06.04.05.125
ECU Pitt County Memorial Hospital, 6/30/1976, 4/1976
UA06.04.05.126
ECU Science Building, 1969-01-31T00:00:00+00:00
UA06.04.05.127
ECTC proposed alterations to exisiting home management housing, Undated
UA06.04.05.128
ECTC proposed new home management housing, Undated
UA06.04.05.129
Renovation and addition to Wall-Coats drama facility, 1976-01-13T00:00:00+00:00
UA06.04.05.130
ECU Brody Library Renovations, Undated, 9/24/98, 9/10/98
UA06.04.05.131
Supply, electrical, sanitary, sewer, 1989-02-22T00:00:00+00:00
UA06.04.05.132
ECU Clement Residence Hall Renovation, overview, 2017-12-01T00:00:00+00:00
UA06.04.05.133
ECU Clement Residence Hall Renovation, Phase I, 2017-12-01T00:00:00+00:00
UA06.04.05.134
ECU Clement Residence Hall Renovation, Phase II, 2017-12-01T00:00:00+00:00
UA06.04.05.135
Biotechnology Building Elevator Modernization, 2018-06-04T00:00:00+00:00
UA06.04.05.136
Dowdy-Ficklen Stadium East End Zone Addition Soceboard Package, 2010-01-21T00:00:00+00:00
UA06.04.05.137
Leo W. Jenkins Cancer Center CT Simulator Replacement, 2014-10-14T00:00:00+00:00
UA06.04.05.138
ECU Fletcher Music Building Elevator Replacement & Upgrades, 2013-02-01T00:00:00+00:00
UA06.04.05.139
Tyler Residence Hall Renovations, 2010-04-09T00:00:00+00:00
UA06.04.05.140
Modifications to Student Plaza Drive, Area B, 2014-05-02T00:00:00+00:00
UA06.04.05.141
Modifications to Student Plaza Drive, 2014-10-30T00:00:00+00:00
UA06.04.05.142
Roof Replacement Biotechnology Building East Carolina University Health Sciences Campus (2 copies), 41795
UA06.04.05.143
Minges Coliseum & Classroom Building Roof Repair and Replacement, 2013-04-20T00:00:00+00:00
UA06.04.05.144
Student Recreation Center Membrane Roof Replacement Phase 2-Skylight Renovation, 2014-06-05T00:00:00+00:00
UA06.04.05.145
East Carolina University Main Sectionalizing Switch-Replace #202, 2013-03-19T00:00:00+00:00
UA06.04.05.146
Bloxton House Roof Replacement, 2014-04-22T00:00:00+00:00
UA06.04.05.147
East Carolina School of Dental Medicine, Community Service Learning Center, 2013-05-01T00:00:00+00:00
UA06.04.05.148
Leo W. Jenkins Fine Arts Center Roof Replacement Asbuilts, 2011-11-17T00:00:00+00:00
UA06.04.05.149
Todd Dining Hall Exterior Stairs, 2015-01-31T00:00:00+00:00
UA06.04.05.150
Fletcher & Garett Residence Halls Fire Sprinkles, 2010-12-10T00:00:00+00:00
UA06.04.05.151
East Carolina University Founders Way Renovation, 2013-05-02T00:00:00+00:00
UA06.04.05.152
Minges Pool Equioment Replacement, 2012-03-02T00:00:00+00:00
UA06.04.05.153
East Carolina School of Dental Medicine, Community Service Learning Center #4 (2 copies), 2014-04-14T00:00:00+00:00
UA06.04.05.154
East Carolina School of Dental Medicine, Community Service Learning Center #7, 2015-01-15T00:00:00+00:00
UA06.04.05.155
Science and Technology Building 3rd and 5th Floor Lab Upfits and Renovations, 2011-07-11T00:00:00+00:00
UA06.04.05.156
ECU Heart Institute Laboratory Upfit, 2014-06-03T00:00:00+00:00
UA06.04.05.157
ECU Neurological and Spine Center Building Envelope Repair, 2015-03-11T00:00:00+00:00
UA06.04.05.158
Umstead and White Fire Sprinkle System, 2011-10-24T00:00:00+00:00
UA06.04.05.159
Bus Stop Improvements, 2015-03-06T00:00:00+00:00
UA06.04.05.160
Exterior ADA improvments ECU, 2015-02-20T00:00:00+00:00
UA06.04.05.161
Umstead Residence Hall Partial Roof Replacement Project, 2013-02-14T00:00:00+00:00
UA06.04.05.162
ECU school of Dentistry Package 2 (Missing Pages), 2010-12-08T00:00:00+00:00
UA06.04.05.163
Apartment Renovations for Clement and Greene Dormitory, 2013-02-19T00:00:00+00:00
UA06.04.05.164
East Carolina School of Dental Medicine, Community Service Learning Center #6, 2015-01-15T00:00:00+00:00
UA06.04.05.165
Warren Life Science Fire Alarm System Replacement, 2014-02-10T00:00:00+00:00
UA06.04.05.166
Bate Emergency Generator, 2013-06-13T00:00:00+00:00
UA06.04.05.167
Wright Place Renovation, 2011-05-31T00:00:00+00:00
UA06.04.05.168
Mamie Jenkins Windon Replacement, 2012-09-25T00:00:00+00:00
UA06.04.05.169
Health Sciences Campus Leo Jenkins Cancer Center Parking Lot ADA Improvements, 2015-02-09T00:00:00+00:00
UA06.04.05.170
Cotanche Renovations Server Rack Cooling Addition, 2012-04-11T00:00:00+00:00
UA06.04.05.171
Minges Colliseum Scoreboard Replacement, 2014-01-15T00:00:00+00:00
UA06.04.05.172
West End Dining Mailbox Improvements, 2015-09-28T00:00:00+00:00
UA06.04.05.173
Building 172 Overall Roof Replacement, 2010-10-21T00:00:00+00:00
UA06.04.05.174
Exterior Wall Reinforcement for Howell Science Building, 2015-10-16T00:00:00+00:00
UA06.04.05.175
Fletcher Residence Hall Renovations & Accessibility Improvements, 2015-11-20T00:00:00+00:00
UA06.04.05.176
Re-combination Plat for Pasquotank County, 2011-10-27T00:00:00+00:00
UA06.04.05.177
Brody Building Lower Roof Replacement, 2010-10-22T00:00:00+00:00
UA06.04.05.178
Belk Residence Hall Air-Conditioning Upgrade, 2007-10-12T00:00:00+00:00
UA06.04.05.179
Upgrade Fire Alarm System Leo Jenkins Cancer Center, 2008-08-15T00:00:00+00:00
UA06.04.05.180
Todd Dining Hall Roof Replacement (2 copies), 2013-03-22T00:00:00+00:00
UA06.04.05.181
Addition of Sprinkler System to Messick Theatre Arts Basement, 2010-08-20T00:00:00+00:00
UA06.04.05.182
Leo W. Jenkins Cancer Center Partial Roof Replacement (2 copies), 2014-10-17T00:00:00+00:00
UA06.04.05.183
Umstead Chiller Replacement, 2012-10-24T00:00:00+00:00
UA06.04.05.184
Historic Mall and Chancelors Way Lighting Plan, 2014-11-07T00:00:00+00:00
UA06.04.05.185
Brody Freight Elevator Upgrades, 2009-05-26T00:00:00+00:00
UA06.04.05.186
Croatan Renovation, 2001-03-06T00:00:00+00:00
UA06.04.05.187
Fletcher Bathroom Renovations (missing pages), 2011-05-23T00:00:00+00:00
UA06.04.05.188
Bate Building Condensate Replacement, 2012-02-03T00:00:00+00:00
UA06.04.05.189
Clement Residence Hall Exterior Building Repairs, 2013-02-01T00:00:00+00:00
UA06.04.05.190
ECU School of Dental Medicine 4th: Community Service Learning Center #8, 2014-07-02T00:00:00+00:00
UA06.04.05.191
Athletics Expansion and Improvements Phase II, 2010-07-07T00:00:00+00:00
UA06.04.05.192
Harrington Field Expansion, 2003-10-17T00:00:00+00:00
UA06.04.05.193
ECU Joyner Library Addition and Renovation, 1993-10-29T00:00:00+00:00
UA06.04.05.194
ECTC Training School Lighting Improvements, 1950-12-01T00:00:00+00:00
UA06.04.05.195
ECTC Wilson Hall Lighting Improvements, 1949-11-07T00:00:00+00:00
UA06.04.05.196
ECU Site Plan Relocate Utilities, undated
UA06.04.05.197
ECU Intramural Athletic Field Lighting, 1976-10-26T00:00:00+00:00
UA06.04.05.198
Close Circuit Television and Talkback Systems, 1957-12-15T00:00:00+00:00
UA06.04.05.199
ECC Automatic Temperature Control Equipment, 1954-01-15T00:00:00+00:00
UA06.04.05.200
ECC College Drive Streetlights, 1959-07-01T00:00:00+00:00
UA06.04.05.201
ECU Repair and replacement of roofs, 1982-09-23T00:00:00+00:00
UA06.04.05.202
ECTC Proposed Copper Pipe Hot WAter System, 1937-08-15T00:00:00+00:00
UA06.04.05.203
ECU Irrigation Plan, undated
UA06.04.05.204
ECU Tennis Court Facilities, 1969-04-10T00:00:00+00:00
UA06.04.05.205
ECTC Electric System Aleterations & New Outside Lighting System, 1950-02-15T00:00:00+00:00
UA06.04.05.206
ECU Replace Roofs Phase III, 1986-07-01T00:00:00+00:00
UA06.04.05.207
ECC Rennovation of Electrictal Distribution System, 1960-09-01T00:00:00+00:00
UA06.04.05.208
ECC Grading and Drainage Athletic Fields, undated
UA06.04.05.209
ECU Reade Street Parking Lot Improvements, 1998-09-30T00:00:00+00:00
UA06.04.05.210
ECC RElocation of Slay Drive and New Sidewalks(South of Flanagan Bldg.), 1962-08-20T00:00:00+00:00
UA06.04.05.211
ECU Reconstruction of Parking Facilities E. 10th St. & College Hill Dr., 1971-06-01T00:00:00+00:00
UA06.04.05.212
ECU Grading, Walks & Drainage Coliseum & Stadium Area, 1968-03-08T00:00:00+00:00
UA06.04.05.213
Design At Intersection of 10th STreet & College Hill Dr. In Greenville, 1963-01-01T00:00:00+00:00
UA06.04.05.214
ECU Parking Lot (McGinnis Auditorium Area), 1976-08-20T00:00:00+00:00
UA06.04.05.215
ECU Extension of College Drive, 1951-12-26T00:00:00+00:00
UA06.04.05.216
ECC Improvements to Plumbing and Electrical Systems, 1956-05-01T00:00:00+00:00
UA06.04.05.217
ECTC Concrete Tunnel for Training School, 1919-06-20T00:00:00+00:00
UA06.04.05.218
ECC Plumbing Improvements, 1953-11-15T00:00:00+00:00
UA06.04.05.219
ECTC Plot Plan and Water Main Extension, undated
UA06.04.05.220
ECTC General Layout of Buildings/ECTC New Hot and Cold Water Piping, 1949-06-13T00:00:00+00:00
UA06.04.05.221
An Addition to Ficklen Stadium ECU, 1967-11-01T00:00:00+00:00
UA06.04.05.222
ECC James S. Ficklen Memorial Stadium New Concrete Walks, 1962-10-25T00:00:00+00:00
UA06.04.05.223
ECC James S. Ficklen Memorial Stadium Site Plan, 1962-02-01T00:00:00+00:00
UA06.04.05.224
ECC James S. Ficklen Memorial Stadium Electrical Site Plan and Details, 1962-02-01T00:00:00+00:00
UA06.04.05.225
ECU Repair Playing Surface Ficklen Stadium, 1983-08-03T00:00:00+00:00
UA06.04.05.226
ECU Ficklen Stadium Lighting Removal and Location, 1974-01-04T00:00:00+00:00
UA06.04.05.227
ECC A New Century Club Building, 1965-05-15T00:00:00+00:00
UA06.04.05.228
ECU VIP Seating for Ficklen Memorial Stadium, 1973-03-20T00:00:00+00:00
UA06.04.05.229
ECU Additions to Ficklen Stadium, 1978-11-13T00:00:00+00:00
UA06.04.05.230
ECU Joyner Library Addition and Renovation, 1993-10-29T00:00:00+00:00
UA06.04.05.231
ECTC Acoustical Treatment, 1949-02-22T00:00:00+00:00
UA06.04.05.232
Spillman, undated
UA06.04.05.233
Spilman Addition, undated
UA06.04.05.234
Fletcher ECU 92406, undated
UA06.04.05.235
Fletcher - Door Schedule, undated
UA06.04.05.236
Rawl ECU 92406, undated
UA06.04.05.237
Flanagan, undated
UA06.04.05.238
Speight ECU 92406, undated
UA06.04.05.239
ECU Austin Building, undated
UA06.04.05.240
Flanagan Class Room Bldg 92406, undated
UA06.04.05.241
New Service Connectionin Exist. Power Plant, undated
UA06.04.05.242
East Carolina College Class Rm. Bldg. Revisions to Underfloor Duct (Electrical), 1958-08-11T00:00:00+00:00
UA06.04.05.243
ECC Classroom Building, Revised Layout for Classroom 132, undated
UA06.04.05.244
Main Building Type Switchboard Detail, 1958-02-20T00:00:00+00:00
UA06.04.05.245
Vault and Switch Room, 1958-02-20T00:00:00+00:00
UA06.04.05.246
Vault, 1958-02-20T00:00:00+00:00
UA06.04.05.247
Transformer Connection Plan, 1958-02-20T00:00:00+00:00
UA06.04.05.248
Undergroung Cable Riser Pole, 1958-02-20T00:00:00+00:00
UA06.04.05.249
Drawing of Joyner Library Stacks(?), undated
UA06.04.05.250
Small Animal Facility East Carolina University, 1978-07-31T00:00:00+00:00
UA06.04.05.251
East Carolina College Science Building, 1967-09-15T00:00:00+00:00
UA06.04.05.252
ECU Repair and replacement of roofs, 1983-01-15T00:00:00+00:00
UA06.04.05.253
Nursing and Home Economics Building, 1982-09-01T00:00:00+00:00
UA06.04.05.254
East Carolina Training School, undated
UA06.04.05.255
Music and administration building, 1958-05-02T00:00:00+00:00
UA06.04.05.256
Addition to administration building, 2022-05-15T00:00:00+00:00
UA06.04.05.257
Repairs to model school, 2020-05-18T00:00:00+00:00
UA06.04.05.258
Practice school building, 2013-06-13T00:00:00+00:00
UA06.04.05.259
Preliminary campus phasing plan, 2000-03-16T00:00:00+00:00
UA06.04.05.260
Additions to model school for ECTC, 2017-06-21T00:00:00+00:00
UA06.04.05.261
Practice school building for ECTC, 2013-07-25T00:00:00+00:00
UA06.04.05.262
Iron work for windows Administration Building, undated
UA06.04.05.263
Accoustical Treatment for ECTC, undated
UA06.04.05.264
Austin Building, 1955-07-01T00:00:00+00:00
UA06.04.05.265
Heating Equipment in Administration Building, 1920-08-08T00:00:00+00:00
UA06.04.05.266
Plumbing improvements Austin Building, 1953-12-15T00:00:00+00:00
UA06.04.05.267
Fletcher Dormitory Planting, 1965-02-18T00:00:00+00:00
UA06.04.05.268
Sports Medicine Physical Education Building, 1989-08-09T00:00:00+00:00
UA06.04.05.269
West Dormitory, 2027-08-17T00:00:00+00:00
UA06.04.05.270
Girls Dormitory, undated
UA06.04.05.271
Plumbing and Toliet Improvements for Wilson Hall, 1948-08-30T00:00:00+00:00
UA06.04.05.272
Joyner Library Plaza w/smaller hand drawing, undated
UA06.04.05.273
Steampower Plant Piping and Auxilaries, 1921-07-15T00:00:00+00:00
UA06.04.05.274
Foundation Layout and Plans for Boilers and Engines, 2021-07-12T00:00:00+00:00
UA06.04.05.275
Electric Wiring and Aparatus, 1921-07-08T00:00:00+00:00
UA06.04.05.276
Plans for Extending Boiler House, 1913-10-04T00:00:00+00:00
UA06.04.05.277
Machine Foundation, 2013-10-04T00:00:00+00:00
UA06.04.05.278
Powerhouse and Laundry ECTC, 1927-08-19T00:00:00+00:00
UA06.04.05.279
Addition to the Laundry Building, 1951-02-01T00:00:00+00:00
UA06.04.05.280
Laundry Addition, 1938-12-10T00:00:00+00:00
UA06.04.05.281
Married Student Apartments, 1968-07-23T00:00:00+00:00
UA06.04.05.282
Street Improvements, 1950-01-06T00:00:00+00:00
UA06.04.05.283
College Street Project, 1956-10-16T00:00:00+00:00
UA06.04.05.284
Real Property Institutional Property Map, 1971-09-03T00:00:00+00:00
UA06.04.05.285
East Carolina University, 1975
UA06.04.05.286
Football Grading and Drainage Plan, 1961-04-25T00:00:00+00:00
UA06.04.05.287
Baseball Grading and Drainage Plan, 1961-04-25T00:00:00+00:00
UA06.04.05.288
Proposed Chapel Suggested Location, 1958-08-04T00:00:00+00:00
UA06.04.05.289
C.B.O. Traffic Pattern, undated
UA06.04.05.290
East Carolina University Property Required for Proposed Reade Street Extension, 1970-03-31T00:00:00+00:00
UA06.04.05.291
Regional Development Center for the Regional Development Institute, 1973-02-07T00:00:00+00:00
UA06.04.05.292
Topographcic Survey Soda Shop Area, undated
UA06.04.05.293
East Carolina Utilities Center, 1981-01-22T00:00:00+00:00
UA06.04.05.294
Dormitory for 500 Men, 1961-05-04T00:00:00+00:00
UA06.04.05.295
Dormitory for Men ECTC, 1948-04-23T00:00:00+00:00
UA06.04.05.296
A lobby addition and alterations for Slay Dormitory for ECC, 1960-06-15T00:00:00+00:00
UA06.04.05.297
Walks and Drains at Slay Dormitory, 1961-02-21T00:00:00+00:00
UA06.04.05.298
Speight and Brewster Buildings Energy Conservation Measures Phase 1, 1983-10-01T00:00:00+00:00
UA06.04.05.299
New Classroom Building for Education and Psychology Departments ECC, 1963-11-20T00:00:00+00:00
UA06.04.05.300
Addition to administration building ECC, 1957-08-01T00:00:00+00:00
UA06.04.05.301
Renovation of Existing Steam Distribution System ECC, 1965-05-10T00:00:00+00:00
UA06.04.05.302
Addition to Heating Plant East Carolina College, 1962-11-09T00:00:00+00:00
UA06.04.05.303
Dormitory for 500 Students East Carolina University, 1967-12-11T00:00:00+00:00
UA06.04.05.304
Conversion of Tyler Dormitory East Carolina University, 1971-04-30T00:00:00+00:00
UA06.04.05.305
Elementary Education Lab School East Carolina University, 1970-01-05T00:00:00+00:00
UA06.04.05.306
A lobby and alterations for Umstead Dormitory, 1960-06-15T00:00:00+00:00
UA06.04.05.307
Walks and Drains at Umstead Dormitory, 1961-02-20T00:00:00+00:00
UA06.04.05.308
1953 Men's Dormitory ECC, 1953-11-15T00:00:00+00:00
UA06.04.05.309
Addition to Music Building ECC, 1957-09-01T00:00:00+00:00
UA06.04.05.310
Converting old Library into Music Building, 1954-06-01T00:00:00+00:00
UA06.04.05.311
Alterations to Convert the Whichard Music Building to Administration Offices for ECU, 1967-07-20T00:00:00+00:00
UA06.04.05.312
Addition and Alteration to Wright Building, 1964-02-15T00:00:00+00:00
UA06.04.05.313
Renovations, Addition, and Alterations to Wright Building, 1964-09-22T00:00:00+00:00
UA06.04.05.314
Eppes, 1993-09-14T00:00:00+00:00
UA06.04.05.315
Gazebo for Public Safety, 1990-04-24T00:00:00+00:00
UA06.04.05.316
Insulation for Steam and Hot Water Lines East Carolina College, undated [1955?]
UA06.04.05.317
New 10 Inch Steam Line from Old Heating Plant to Memorial Gymnasium Phase 2, 1975-09-01T00:00:00+00:00
UA06.04.05.318
Proposed Layout of ECU Sub Station, undated
UA06.04.05.319
Addition to Heating Plant ECC, 1962-05-24T00:00:00+00:00
UA06.04.05.320
East Carolina University Heating Plant Phase 1, 1974-08-01T00:00:00+00:00
UA06.04.05.321
Renovating of Bathroom Jarvis Hall, 1964-04-08T00:00:00+00:00
UA06.04.05.322
East Dormitory ECTC, 1927-08-20T00:00:00+00:00
UA06.04.05.323
Heating Apparatus for East Wing Addition to East Dorm, 1920-02-04T00:00:00+00:00
UA06.04.05.324
Eastern Carolina University L. Jenkins Fine Arts Center Fume Hood, 1975-04-10T00:00:00+00:00
UA06.04.05.325
Leo W. Jenkins Fine Arts Center, 1975-04-07T00:00:00+00:00
UA06.04.05.326
Leo Jenkins Fine Arts Center, 1975-09-11T00:00:00+00:00
UA06.04.05.327
Leo W. Jenkins Fine Arts Center, 1975-03-27T00:00:00+00:00
UA06.04.05.328
Leo W. Jenkins Fine Arts Center, 1963-12-05T00:00:00+00:00
UA06.04.05.329
Leo Jenkins Fine Arts Center, 1975-11-01T00:00:00+00:00
UA06.04.05.330
Erection Plans for Leo W. Jenkins Fine Arts Center, 1975-04-01T00:00:00+00:00
UA06.04.05.331
Leo W. Jenkins Fine Arts Center, 1975-12-11T00:00:00+00:00
UA06.04.05.332
Leo W. Jenkins Fine Arts Center, 1975-08-22T00:00:00+00:00
UA06.04.05.333
Leo W. Jenkins Fine Arts Center, 1975-06-23T00:00:00+00:00
UA06.04.05.334
Minutes Coliseum Seating Plan, undated
UA06.04.05.335
Addition to Leo W. Jenkins Fine Arts Center, 1975-01-21T00:00:00+00:00
UA06.04.05.336
Leo W. Jenkins Fine Arts Center, 1975-01-21T00:00:00+00:00
UA06.04.05.337
Leo W. Jenkins Fine Arts Center, 1975-01-21T00:00:00+00:00
UA06.04.05.338
School of Art Building, 1972-08-25T00:00:00+00:00
UA06.04.05.339
Leo W. Jenkins Fine Arts Center, 1975-04-11T00:00:00+00:00
UA06.04.05.340
Dormitory for 512 Men, 1957-06-01T00:00:00+00:00
UA06.04.05.341
Jones Residence Hall CIS Renovation, 1996-06-01T00:00:00+00:00
UA06.04.05.342
Second Addition to the Joyner Library, undated
UA06.04.05.343
Basement Floor Plan Renovations to Joyner Library, 1975-03-03T00:00:00+00:00
UA06.04.05.344
Shelving and Chase Placement - Joyner Library Second Addition, 1967-10-18T00:00:00+00:00
UA06.04.05.345
Extra Copy of Shelving and Furniture Only - Final Not Color Coded, 1974-03-29T00:00:00+00:00
UA06.04.05.346
Library Addition - East Carolina University, 1972-12-15T00:00:00+00:00
UA06.04.05.347
Telephone Equipment Room, 1967-12-12T00:00:00+00:00
UA06.04.05.348
Renovations to the Joyner Library, 1975-03-03T00:00:00+00:00
UA06.04.05.349
Second Addition to the Joyner Library, 1966-08-22T00:00:00+00:00
UA06.04.05.350
Second Addition and Alter[ations] to Joyner Library, 1968-08-22T00:00:00+00:00
UA06.04.05.351
ECU Fletcher Music Building - Music Library Renovation, 2014-06-12T00:00:00+00:00
UA06.04.05.352
Alterations and Addition to Maintenance Shop for ECC, 1964-03-02T00:00:00+00:00
UA06.04.05.353
Storage Facility for Flammable Liquids, 1976-04-02T00:00:00+00:00
UA06.04.05.354
Workshop and Warehouse for Maintenance Department, 1949-02-25T00:00:00+00:00
UA06.04.05.355
Addition to Maintenance Shop, 1968-02-12T00:00:00+00:00
UA06.04.05.356
Addition to Primary Training School, 1949-02-11T00:00:00+00:00
UA06.04.05.357
Addition of Air Conditioning to McGinnis Auditorium, 1964-01-01T00:00:00+00:00
UA06.04.05.358
Student Union, 1970-05-15T00:00:00+00:00
UA06.04.05.359
Methodist Student Center, 1957-05-20T00:00:00+00:00
UA06.04.05.360
Training School ECTC, 1927-08-20T00:00:00+00:00
UA06.04.05.361
Training School Addition ECTC, 1929-07-17T00:00:00+00:00
UA06.04.05.362
An Addition to the Kindergarten at East Carolina College, undated
UA06.04.05.363
Gymnasium Addition to Primary Training School, 1949-05-31T00:00:00+00:00
UA06.04.05.364
A Century Club Building, 1965
UA06.04.05.365
Pitt County Memorial Hospital/ECU Medical School Alterations/Additions, 1976-11-01T00:00:00+00:00
UA06.04.05.366
Pitt County Memorial Hospital Inc., 1974-09-16T00:00:00+00:00
UA06.04.05.367
Field House, 1966-03-17T00:00:00+00:00
UA06.04.05.368
Office Addition to the W. M. Scales Field House, 1971-05-27T00:00:00+00:00
UA06.04.05.369
Additions and Renovations to the W. M. Scales Field House, 1981-12-23T00:00:00+00:00
UA06.04.05.370
Additions and Renovations to the W. M. Scales Field House, 1982-02-25T00:00:00+00:00
UA06.04.05.371
Additions and Renovations to the W. M. Scales Field House, 1972-03-01T00:00:00+00:00
UA06.04.05.372
General Layout of New Hot Water Supply System, 1919-06-03T00:00:00+00:00
UA06.04.05.373
Power Plant Building Alterations for ECTC, 1949-09-08T00:00:00+00:00
UA06.04.05.374
East Carolina University General Classroom Building, 1982-04-14T00:00:00+00:00
UA06.04.05.375
Small Animal Facility, 1976-11-10T00:00:00+00:00
UA06.04.05.376
Faculty Club for East Carolina Teachers College, 1923-06-09T00:00:00+00:00
UA06.04.05.377
Plumbing Improvements Ragsdale Hall, 1952-09-12T00:00:00+00:00
UA06.04.05.378
Addition to Ragsdale Hall, 1951-05-17T00:00:00+00:00
UA06.04.05.379
Renovations to Ragsdale Hall - Interim On-Campus Facilities for the School of Medicine, 1975-06-01T00:00:00+00:00
UA06.04.05.381
Heating - Classroom Building, 1957-11-01T00:00:00+00:00
UA06.04.05.382
Addition to New Classroom Building, 1959-05-25T00:00:00+00:00
UA06.04.05.383
Classroom Building, 1957-11-01T00:00:00+00:00
UA06.04.05.384
Speight Repair Electrical System, 2009-04-17T00:00:00+00:00
UA06.04.05.385
Nursing Tower Addition, 1979-06-22T00:00:00+00:00
UA06.04.05.386
Nursing Tower Addition, 1981-01-16T00:00:00+00:00
UA06.04.05.387
Nursing Tower Addition, 1979-04-20T00:00:00+00:00
UA06.04.05.388
Nursing Tower Addition, 1979-06-22T00:00:00+00:00
UA06.04.05.389
Family Medicine Center Lower Level Lab Renovation, 2018-02-04T00:00:00+00:00
UA06.04.05.390
Aycock Residence Hall - Door Replacement, 2009-04-30T00:00:00+00:00
UA06.04.05.391
2016-2017 ADA Improvements Veterans Way, 2017-02-16T00:00:00+00:00
UA06.04.05.392
Replace Circuit Breakers Brody School of Medicine, 2017-11-20T00:00:00+00:00
UA06.04.05.393
ECU Cotton Residence Hall Bathroom Renovation, 2018-09-26T00:00:00+00:00
UA06.04.05.394
White Residence Hall Renovation, 42647
UA06.04.05.395
Replace Sectionalizing Breakers in Switchboards A and B Brody School of Medicine, 2017-05-25T00:00:00+00:00
UA06.04.05.396
Fletcher Music Hall Fire Alarm Upgrade, 2017-04-07T00:00:00+00:00
UA06.04.05.397
Warehouse District Fiberoptic, 2017-09-01T00:00:00+00:00
UA06.04.05.398
Messick and Jenkins Art Replacing Transformers, 2017-02-01T00:00:00+00:00
UA06.04.05.399
ECU Faculty Way Sewer Replacement, 2017-02-22T00:00:00+00:00
UA06.04.05.400
Leo W. Jenkins Fine Arts Center Partial Roof Replacement, 2016-08-30T00:00:00+00:00
UA06.04.05.401
ECU HSC Replace Electrical Panel SSE, 2017-05-31T00:00:00+00:00
UA06.04.05.402
Leo W. Jenkins Cancer Center, 2016-08-30T00:00:00+00:00
UA06.04.05.403
Joyner Library Roof Replacement, 2016-06-01T00:00:00+00:00
UA06.04.05.404
North Recreational Complex Phase 2, 2010-04-07T00:00:00+00:00
UA06.04.05.405
Tyler Residence Hall Elevator Smoke Curtains, 2018-03-26T00:00:00+00:00
UA06.04.05.406
Fire Alarm Upgrade Aycock Hall, 2010-10-27T00:00:00+00:00
UA06.04.05.407
Structural Repair of Erwin Hall, 1990-05-25T00:00:00+00:00
UA06.04.05.408
Apartment Dormitory for Teachers at ECTC - COM #819, 1950-11-24T00:00:00+00:00
UA06.04.05.409
Apartment Dormitory for Teachers at ECTC - COM #799, 1948-08-23T00:00:00+00:00
UA06.04.05.410
Flanagan Building, Attic Floorplan, 1957-03-13T00:00:00+00:00
UA06.04.05.411
Flanagan Building, Basement or Groundfloor Plan, undated
UA06.04.05.412
Addition to Flanagan Building, 1962-11-26T00:00:00+00:00
UA06.04.05.413
Renovation of Room 209, Flanagan Building, 1967-03-01T00:00:00+00:00
UA06.04.05.414
Electrical Renovations, Flanagan Building, 1964-02-13T00:00:00+00:00
UA06.04.05.415
Alterations to Flanagan Building, 1959-06-25T00:00:00+00:00
UA06.04.05.416
Girls Dormitory East Carolina Teachers College, 1922-04-19T00:00:00+00:00
UA06.04.05.417
Fleming Hall Bathroom Renovation, 1960-03-11T00:00:00+00:00
UA06.04.05.418
Fleming Dormitory Renovations and Air Conditioning, 1984-04-13T00:00:00+00:00
UA06.04.05.419
Language Laboratory Tape Recording and Intercom Systems, 1959-12-01T00:00:00+00:00
UA06.04.05.420
Addition to Graham Building, 1960-03-29T00:00:00+00:00
UA06.04.05.421
Dormitory for Women (Fletcher), 1962-07-31T00:00:00+00:00
UA06.04.05.422
Electrical Site Plan Music Building, 1965-02-08T00:00:00+00:00
UA06.04.05.423
East Carolina College Music Building, 1965-01-19T00:00:00+00:00
UA06.04.05.424
Garrett Residence Hall, 1991-11-21T00:00:00+00:00
UA06.04.05.425
Part Foundation Plan Dormitory for Women, 1955-04-29T00:00:00+00:00
UA06.04.05.426
Roof Repairs Garrett Dormitory, 1983-03-31T00:00:00+00:00
UA06.04.05.427
Dormitory for Women, East Carolina College, 1954-09-21T00:00:00+00:00
UA06.04.05.428
Revisions to Primary Electric Service, Dormitory for Women, 1955-05-13T00:00:00+00:00
UA06.04.05.429
Schematic Design Drawings, Dormitory for Women, 1963-10-16T00:00:00+00:00
UA06.04.05.430
Classroom Building for Department of Home Economics, 1966-08-25T00:00:00+00:00
UA06.04.05.431
Classroom Building for School of Nursing, 1965-11-20T00:00:00+00:00
UA06.04.05.432
Evaluation Clinic and Daycare Center, 1969-01-01T00:00:00+00:00
UA06.04.05.433
Evaluation Clinic and Daycare Center: Site Plan Details, 1968-07-22T00:00:00+00:00
UA06.04.05.434
Steam Plant Partial Roof Replacement, 2008-09-10T00:00:00+00:00
UA06.04.05.435
Joyner Library Addition and Renovation, 1993-10-29T00:00:00+00:00
UA06.04.05.436
Nursing Tower Addition: Electrical, 1979-06-22T00:00:00+00:00
UA06.04.05.437
Nursing Tower Addition: Partial-Second Floor Plan, 1981-01-16T00:00:00+00:00
UA06.04.05.438
Nursing Tower Addition: Plumbing Site Plan, 1979-06-22T00:00:00+00:00
UA06.04.05.439
Nursing Tower Addition: Site Plan, 1979-04-20T00:00:00+00:00
UA06.04.05.440
Nursing Tower Addition: Foundation and Framing, 1979-04-20T00:00:00+00:00
UA06.04.05.441
Nursing Tower Addition: Pumbling Design Development, 1979-04-20T00:00:00+00:00
UA06.04.05.442
Nursing Tower Addition: Mechanical, 1979-06-22T00:00:00+00:00
UA06.04.05.443
Nursing Tower Addition: Plan-Partial, 1979-06-22T00:00:00+00:00
UA06.04.05.444
Fuel Oil Piping Replacement, 2008-10-03T00:00:00+00:00
UA06.04.05.445
Joyner Library Addition and Renovation, 1990-11-09T00:00:00+00:00
UA06.04.05.446
Rivers Building Addition, 2002-05-15T00:00:00+00:00
UA06.04.05.447
School of Allied Health Sciences, School of Nursing, 2007-08-01T00:00:00+00:00
UA06.04.05.449
Wright Auditorium, 1956-04-18T00:00:00+00:00
UA06.04.05.450
Plumbing Improvements Wright Building, 1953-11-15T00:00:00+00:00
UA06.04.05.451
Alterations and Additions to Wright Building, 1976-11-10T00:00:00+00:00
UA06.04.05.452
Wright Building Basement Alterations for Student Union, 1952-05-26T00:00:00+00:00
UA06.04.05.453
Renovation of Wright Building, 1981-03-26T00:00:00+00:00
UA06.04.05.454
Renovation of Wright Building, 1980-09-05T00:00:00+00:00
UA06.04.05.455
Addition and Alterations to Wright Building, 1965-09-15T00:00:00+00:00
UA06.04.05.456
Renovations, Addition, and Alterations to Wright Building, 1964-09-22T00:00:00+00:00
UA06.04.05.457
Renovations, Addition, and Alterations to Wright Building, 1962-02-15T00:00:00+00:00
UA06.04.05.458
Dormitory for Women, East Carolina College, January, 1967
UA06.04.05.459
Stadium Guardrail Repairs, 2005-09-20T00:00:00+00:00
UA06.04.05.460
Second Floor Teaching Annex, 2004-01-08T00:00:00+00:00
UA06.04.05.461
ECU Teaching Addition West Tower, 1981-11-30T00:00:00+00:00
UA06.04.05.462
Life Sciences Building Addition ECU Medical School, 1995-10-30T00:00:00+00:00
UA06.04.05.463
[Elevator System] ECU Life Sciences Building, 1996-07-23T00:00:00+00:00
UA06.04.05.464
Health Sciences Campus Lighting, 2002-12-17T00:00:00+00:00
UA06.04.05.465
Electrical Schedule, 1989-03-03T00:00:00+00:00
UA06.04.05.466
Medical Waste Incinerator, 1997-02-05T00:00:00+00:00
UA06.04.05.468
Admissions Whichard Building, 1990-05-02T00:00:00+00:00
UA06.04.05.469
Admissions Whichard Building, 1990-02-27T00:00:00+00:00
UA06.04.05.470
Admissions Entrance Detail, 1990-03-20T00:00:00+00:00
UA06.04.05.472
Speight 102 A and 102 B, 1990-03-22T00:00:00+00:00
UA06.04.05.473
Speight 112 C Renovation, 1992-09-30T00:00:00+00:00
UA06.04.05.474
Admissions Entrance Detail - Unlabeled, undated
UA06.04.05.475
Joyner Library Addition and Renovation, 1992-01-03T00:00:00+00:00
UA06.04.05.476
East Carolina University Medical Waste Incinerator, 1999-03-03T00:00:00+00:00
UA06.04.05.477
School of Medicine Fiberoptic Telecommunication Network, 1993-03-10T00:00:00+00:00
UA06.04.05.478
North "C" Elevator Brody Building, 1999-09-13T00:00:00+00:00
UA06.04.05.479
Relocation of Master Station, undated
UA06.04.05.480
East Carolina College Austin Building, 1956-07-13T00:00:00+00:00
UA06.04.05.481
Harris Building, undated
UA06.04.05.482
Aycock Sidewalk, 1991-12-19T00:00:00+00:00
UA06.04.05.483
Preliminary Drawing Teachers' Home ECTC, 1947-11-13T00:00:00+00:00
UA06.04.05.484
East Campus Development Map, undated
UA06.04.05.485
Vicinity Map for MK Blount, undated
UA06.04.05.486
Tennis Court Project, undated
UA06.04.05.487
Plan Showing Wing ECTTS, 1913-03-12T00:00:00+00:00
UA06.04.05.488
East Elevation ECTTS, 1913-03-12T00:00:00+00:00
UA06.04.05.489
Teachers' Training School, undated
UA06.04.05.490
Preliminary Land Ownership Map, undated
UA06.04.05.491
Proposed Kitchen Plan ECTTS, undated
UA06.04.05.492
Proposed Walks Garret Hall, 1955-11-02T00:00:00+00:00
UA06.04.05.493
Proposed Parking Lots ECC, undated
UA06.04.05.494
Property of East Carolina College Dormitory Site, October, 1957
UA06.04.05.495
New Floor System for Jarvis Hall Bathroom Renovation, 1964-07-13T00:00:00+00:00
UA06.04.05.496
Leo Jenkins Fine Arts Center, 1975-05-12T00:00:00+00:00
UA06.04.05.497
Home Management House, undated
UA06.04.05.498
Proposed Alterations to Existing Home Management House, undated
UA06.04.05.499
Reap Playground, 1991-05-24T00:00:00+00:00
UA06.04.05.500
Jarvis Street Site Plan, 1991-03-19T00:00:00+00:00
UA06.04.05.501
Working Drawings, Specifications, and Details for Renovations- Chancellor's Home, undated
UA06.04.05.502
Proposed Alterations of the President's Residence into Four One-Bedroom Apartments, undated
UA06.04.05.503
President's Home, ECTTS, undated
UA06.04.05.504
Proposed Sign for Minges Coliseum, 1968-07-22T00:00:00+00:00
UA06.04.05.506
Library Building ECTC, 1923-06-12T00:00:00+00:00
UA06.04.05.507
Cotten Hall Women's Dorm, June, 1923
UA06.04.05.508
Fleming Girls Dormitory, April, 1922
UA06.04.05.509
Revised Underground Drainage System for Stormwater, Dormitory for Women, 1955-09-01T00:00:00+00:00
UA06.04.05.510
First Unit Classroom G, ECTC, 1929-07-22T00:00:00+00:00
UA06.04.05.511
East Carolina Teachers' Training School Electrical Distribution, 1909-08-19T00:00:00+00:00
UA06.04.05.512
Foundation and First Floor Framing Plan - Infirmary Building, 1929-07-17T00:00:00+00:00
UA06.04.05.513
Copy of Foundation and First Floor - Infirmary Building, 1929-07-17T00:00:00+00:00
UA06.04.05.514
Infirmary Renovation, undated
UA06.04.05.515
Office Conversion for Director of Dining Services, Jones Residence Hall, 1990-06-07T00:00:00+00:00
UA06.04.05.516
Site Improvements for Traffic Island, East of White Dormitory, 1990-03-16T00:00:00+00:00
UA06.04.05.517
Greene Hall First Floor Renovation, 1991-12-17T00:00:00+00:00
UA06.04.05.518
Erwin Hall Settlement Area, 1990-08-09T00:00:00+00:00
UA06.04.05.519
East Carolina University Warehouse Stair, 1987-07-01T00:00:00+00:00
UA06.04.05.520
Family Therapy, 1990-05-29T00:00:00+00:00
UA06.04.05.521
East Carolina Proposed Drainage Improvements, [1953]?
UA06.04.05.522
Final Report Drainage Improvements ECC, 1953-11-19T00:00:00+00:00
UA06.04.05.523
Football Aiming Chart, 1949-03-25T00:00:00+00:00
UA06.04.05.524
Campus Drainage and Area Development, 1967-08-07T00:00:00+00:00
UA06.04.05.525
Renovation of Wright Building, 1980-10-13T00:00:00+00:00
UA06.04.05.526
Wright Building, 1976-11-22T00:00:00+00:00
UA06.04.05.527
Wright Basement Alterations ECC, 1954-02-01T00:00:00+00:00
UA06.04.05.528
Alterations to Whichard Music Building, undated
UA06.04.05.529
Proposed Addition to the Administration Building East Carolina College, undated
UA06.04.05.530
Joyner Library Additions and Renovations, 1993-10-29T00:00:00+00:00
UA06.04.05.531
Section A-A, undated
UA06.04.05.532
Halon 1301 System for Austin Room 101 Computer Center, 1984-08-02T00:00:00+00:00
UA06.04.05.533
School of Business General Classroom Building, 1990-03-22T00:00:00+00:00
UA06.04.05.534
Senior Class of 1992 General Classroom Building Site Improvements, 1992-04-29T00:00:00+00:00
UA06.04.05.535
New Shop Area, undated
UA06.04.05.536
Leo W. Jenkins Fine Arts Center, 1965-04-16T00:00:00+00:00
UA06.04.05.537
Metal Screen Replacement for Belk Residence Hall, undated
UA06.04.05.538
Athletics Expansion and Improvements, Phase 3 Team Building, 2012-09-17T00:00:00+00:00
UA06.04.05.539
Roof Replacement Project, McGinnis Theater, 2013-12-18T00:00:00+00:00
UA06.04.05.540
East Carolina University Brody Chiller, 2013-01-24T00:00:00+00:00
UA06.04.05.541
PIrate Club and Athletic Ticket Office Roof Replacement, 2010-11-08T00:00:00+00:00
UA06.04.05.542
ECU Croatan Dining Hall, 2009-08-19T00:00:00+00:00
UA06.04.05.543
ECU Croatan Dining Hall Pictoral View, 1969-05-13T00:00:00+00:00
UA06.04.05.544
Croatan Renovation, 2001-03-06T00:00:00+00:00
UA06.04.05.545
Croatan Snack Shop Food Service Renovation, 1991-02-07T00:00:00+00:00
UA06.04.05.546
Proposed Renovations, Croatan Snack Shop, 1990-10-10T00:00:00+00:00
UA06.04.05.547
Croatan Roof Replacement, 1990-05-02T00:00:00+00:00
UA06.04.05.548
ECU - Student Supply Store, 1970-02-07T00:00:00+00:00
UA06.04.05.549
Compressed Air System for Dental Sim. Lab at Brody, 2011-09-19T00:00:00+00:00
UA06.04.05.550
Clement Residence Hall Door Replacement, 2011-08-29T00:00:00+00:00
UA06.04.05.551
East Carolina University Clement Hall Screen Wall, 2006-01-30T00:00:00+00:00
UA06.04.05.552
Clement Residence Hall Standby Generator, 2005-11-18T00:00:00+00:00
UA06.04.05.553
Fire Alarm Upgrade Clement Residence Hall, 2006-11-14T00:00:00+00:00
UA06.04.05.554
Allied Health Project Sprinkler Piping Plan, 2005-01-08T00:00:00+00:00
UA06.04.05.555
ECU School of Allied Health Services Coordination Electrical Plan, 2004-11-29T00:00:00+00:00
UA06.04.05.556
ECU School of Allied Health Services Fourth Floor Composite Drawings, 2005-01-03T00:00:00+00:00
UA06.04.05.557
ECU Campus Sewer Repairs, 2007-05-10T00:00:00+00:00
UA06.04.05.558
Allied Health Services First Floor Composite Drawings, 2005-03-18T00:00:00+00:00
UA06.04.05.559
Reroofing Plan for Cotten Residence Hall, 2006-01-06T00:00:00+00:00
UA06.04.05.560
Library ECTC, 1950-12-28T00:00:00+00:00
UA06.04.05.561
Joyner Library Roof Replacement, 2007-10-30T00:00:00+00:00
UA06.04.05.562
ECU Fire Alarm System for Speight Building, 2006-12-31T00:00:00+00:00
UA06.04.05.563
Speight Building Roof Replacement, 2006-11-09T00:00:00+00:00
UA06.04.05.564
ECU School of Allied Health Services Penthouse Drawings, 2004-12-08T00:00:00+00:00
UA06.04.05.565
Fire Alarm Upgrade Jones and Garret Residence Halls, 2007-10-10T00:00:00+00:00
UA06.04.05.566
ECU Brody School of Medicine, Eastern Carolina Cardiovascular Institute, 2005-03-11T00:00:00+00:00
UA06.04.05.567
Wright Auditorium and Snead Building Roof and Window Replacement, 2013-04-09T00:00:00+00:00
UA06.04.05.568
Brewster Building Elevator Modification, 2013-03-15T00:00:00+00:00
UA06.04.05.569
ECU School of Allied Health Services Second Floor Composite Drawings, 2005-02-28T00:00:00+00:00
UA06.04.05.570
ECU School of Allied Health Services Third Floor Composite Drawings, 2005-02-08T00:00:00+00:00
UA06.04.05.571
ECU School of Allied Health Services Fourth Floor Composite Drawings, 2005-01-11T00:00:00+00:00
UA06.04.05.572
AJ Fletcher Music Center Addition, 2008-09-25T00:00:00+00:00
UA06.04.05.573
Dowdy-Ficklen Stadium East Endzone Addition, 2009-10-16T00:00:00+00:00
UA06.04.05.574
Dowdy-Ficklen Stadium Southside Elevator Modernization, 2010-03-18T00:00:00+00:00
UA06.04.05.575
ECU Brody GE99 Data Center Upgrade, 2013-03-08T00:00:00+00:00
UA06.04.05.576
ECU Steam Plant Boiler #1 Repairs, 2009-04-17T00:00:00+00:00
UA06.04.05.577
Aycock and Jones Residence Halls Fire Protection System, 2008-12-26T00:00:00+00:00
UA06.04.05.578
ECU Garret Hall Door Replacement, 2008-07-22T00:00:00+00:00
UA06.04.05.579
Messick Theatre Arts Center and McGinnis Auditorium Fire Alarm Upgrade and Door Replacement, 2007-03-14T00:00:00+00:00
UA06.04.05.580
Brody MRI Building, 2009-10-05T00:00:00+00:00
UA06.04.05.581
Lower Minges Parking Lot Storm Sewer Replacement, 2008-02-28T00:00:00+00:00
UA06.04.05.582
Malene G. Irons Building Roof Replacement, 2007-07-16T00:00:00+00:00
UA06.04.05.583
Eastern Carolina Cardiovascular Institute, 2005-03-11T00:00:00+00:00
UA06.04.05.584
Auxilia Student Supply Store ECU, 1968-07-24T00:00:00+00:00
UA06.04.05.585
Development Plan for East Carolina Teachers' College, 1922-07-01T00:00:00+00:00
UA06.04.05.586
Schedule of Bids for the Administration Building ECTC, 1922-05-29T00:00:00+00:00
UA06.04.05.587
Addition to Laundry Building ECTC, 1951-02-01T00:00:00+00:00
UA06.04.05.588
Topographic Survey Being the Area North of Joyner Library, undated
UA06.04.05.589
State of North Carolina East Carolina College, undated
UA06.04.05.590
Map of East Carolina College, 1953-06-01T00:00:00+00:00
UA06.04.05.591
East Carolina College with Topographic Map of Blount Property, undated
UA06.04.05.592
Map of ECTC (Topographic), 1946-03-01T00:00:00+00:00
UA06.04.05.593
Map of Proposed Spur Track ECTC, undated
UA06.04.05.594
Topographic Survey Being the Southeast Corner of Reade Circle and Fifth Street, undated
UA06.04.05.595
Final Preliminary Master Plan East Carolina College, 1965-02-08T00:00:00+00:00
UA06.04.05.596
Foundation Plan Addition to Administration Building ECTC, 1922-05-10T00:00:00+00:00
UA06.04.05.597
Todd Dining Hall Renovation, 2007-12-07T00:00:00+00:00
UA06.04.05.598
ECU School of Allied Health Services 4th Floor D-1 Composite Drawings, 2005-01-03T00:00:00+00:00
UA06.04.05.599
Classroom Building ECTC, 1938-12-13T00:00:00+00:00
UA06.04.05.600
Cotten Residence Hall HVAC Improvements, 2009-08-21T00:00:00+00:00
UA06.04.05.601
Willis Building Roof Replacement, 2007-06-28T00:00:00+00:00
UA06.04.05.602
ECU Wright Circle Infrastructure Improvements, 2006-09-08T00:00:00+00:00
UA06.04.05.603
Brewster and Jenkins Fine Arts Replace Transformer and Oil Switch, 2005-06-22T00:00:00+00:00
UA06.04.05.604
ECU Jones Hall Steps, 2004-03-30T00:00:00+00:00
UA06.04.05.605
Clement, Greene, and White Residence Halls HVAC Upgrades, 2005-01-28T00:00:00+00:00
UA06.04.05.606
ECU College Hill Steps, 2004-03-30T00:00:00+00:00
UA06.04.05.607
ECU School of Dentistry Mobile Unit, 2011-03-23T00:00:00+00:00
UA06.04.05.608
Eastern Carolina Cardiovascular Institute Final As Built Drawings, 2009-03-20T00:00:00+00:00
UA06.04.05.609
Teacher's Dormitory ECTC, 1951-05-24T00:00:00+00:00
UA06.04.05.610
Classroom Building ECTC, 1939-07-05T00:00:00+00:00
UA06.04.05.611
ECTC or ECC Campus, undated
UA06.04.05.612
Finishing Attic Floor Flanagan Building, 1955-09-01T00:00:00+00:00
UA06.04.05.613
Ventilating Attic CR of Flanagan Building, 1957-12-05T00:00:00+00:00
UA06.04.05.614
Dormitory for 520 Men, 1957-12-16T00:00:00+00:00
UA06.04.05.615
New Austin Building for East Carolina College, 1961-09-20T00:00:00+00:00
UA06.04.05.616
Health and Physical Education Building, 1951-01-08T00:00:00+00:00
UA06.04.05.617
Apartment Dormitory for Teachers ECTC, 1950-06-01T00:00:00+00:00
UA06.04.05.618
Workshop and Warehouse forMaintenance Department, 1949-02-25T00:00:00+00:00
UA06.04.05.619
Converting Old Library into Music Building, 1954-06-01T00:00:00+00:00
UA06.04.05.620
Men's Dormitory, 1955-04-21T00:00:00+00:00
UA06.04.05.621
Library ECTC, 1950-07-14T00:00:00+00:00
UA06.04.05.622
Addition to Jones Dormitory Cafeteria, 1965-03-03T00:00:00+00:00
UA06.04.05.623
Remodeling Existing Dietary Department, 1954-10-11T00:00:00+00:00
UA06.04.05.624
Dormitory for 512 Men, 1957-06-01T00:00:00+00:00
UA06.04.05.625
Eight Car Garage, 1938-10-22T00:00:00+00:00
UA06.04.05.626
Classroom Building ECTC, 1938-12-10T00:00:00+00:00
UA06.04.05.627
Exterior ADA Improvements, 2016-02-04T00:00:00+00:00
UA06.04.05.628
Human Resources Fire Alarm Upgrade, 2017-01-13T00:00:00+00:00
UA06.04.05.629
Clement and Greene Fire Supression System, 2012-03-29T00:00:00+00:00
UA06.04.05.630
Eastern Carolina Cardiovascular Institute, 2005-03-11T00:00:00+00:00
UA06.04.05.631
ECU Reade Street Market West End Dining Hall Renovations, 2015-02-24T00:00:00+00:00
UA06.04.05.632
ECU Boiler Upgrades, 2009-01-26T00:00:00+00:00
UA06.04.05.633
ECU Cardiovascular Institute, 2005-03-11T00:00:00+00:00
UA06.04.05.634
HSC Proposed Expansion, 2005-08-08T00:00:00+00:00
UA06.04.05.635
ECU Main Campus Parking, 2006-04-26T00:00:00+00:00
UA06.04.05.636
ECU Student Services Buildng, 2017-07-20T00:00:00+00:00
UA06.04.05.637
School of Medicine ECU, 1984-11-06T00:00:00+00:00
UA06.04.05.638
Renovations to Bate Building, 2016-03-23T00:00:00+00:00
UA06.04.05.639
Interior Renovations to Todd Dining Hall, 2015-05-22T00:00:00+00:00
UA06.04.05.640
Renovations to ECU Bate Building - Dean Suite, 2016-01-05T00:00:00+00:00
UA06.04.05.641
Dormitory for 500 Men, 1964-04-24T00:00:00+00:00
UA06.04.05.642
Dormitory for Men, 1948-02-23T00:00:00+00:00
UA06.04.05.643
Laundry Addition to ECTC, 1938-12-10T00:00:00+00:00
UA06.04.05.644
Preliminary Plans, Dormitory for Teachers, 1948-03-20T00:00:00+00:00
UA06.04.05.645
ECTC Campus Buildings, 1938-06-15T00:00:00+00:00
UA06.04.05.646
Eastern Carolina Cardiovascular Institute, 2005-03-11T00:00:00+00:00
UA06.04.05.647
Modifications to Student Plaza Drive, 2013-04-30T00:00:00+00:00
UA06.04.05.648
Warren Life Sciences Building Second Floor Renovation, 2016-11-15T00:00:00+00:00
UA06.04.05.649
ECU Minges/HHP Fire Alarm Upgrade, 2015-02-24T00:00:00+00:00
UA06.04.05.650
ECU Dorms Roof Plan, 2003-10-14T00:00:00+00:00
UA06.04.05.651
Jones Hall Door Replacement, 2003-02-21T00:00:00+00:00
UA06.04.05.652
Stadium Maintenance Repair Dowdy Ficklen Stadium, 2003-11-11T00:00:00+00:00
UA06.04.05.653
Clement, Greene, and White Residence Halls HVAC Upgrades, 2003-10-24T00:00:00+00:00
UA06.04.05.654
Howell Science Chilled Water Modifications, 2004-07-15T00:00:00+00:00
UA06.04.05.655
Java City Joyner Library, 2003-09-11T00:00:00+00:00
UA06.04.05.656
ECU Student Recreation Center Court Modifications, 2003-10-08T00:00:00+00:00
UA06.04.05.657
Floyd Emergency Steam Manhole Repairs, 2004-11-24T00:00:00+00:00
UA06.04.05.658
Domestic Hot Water Steam Replacement for Cotten and Fleming Dorms, 2002-08-20T00:00:00+00:00
UA06.04.05.659
HSC Laupus Library, 1984-11-06T00:00:00+00:00
UA06.04.05.660
ECTC Equipment, 1939-09-08T00:00:00+00:00
UA06.04.05.661
Classroom Building ECTC, 1938-12-10T00:00:00+00:00
UA06.04.05.662
Classroom Building ECTC, 1938-12-10T00:00:00+00:00
UA06.04.05.663
School of Medicine ECU, 1979-03-30T00:00:00+00:00
UA06.04.05.664
Dormitory for Women ECC, 1967-09-01T00:00:00+00:00
UA06.04.05.665
Plumbing, Heating, Electrical, Dormitory for 500 Students, 1967-12-11T00:00:00+00:00
UA06.04.05.666
Topographic Map ECC Annex, 1953-08-01T00:00:00+00:00
UA06.04.05.667
Building Site Survey Third Men's Dormitory, 1960-08-01T00:00:00+00:00
UA06.04.05.668
Apartment Dorm for Teachers ECTC, 1950-01-05T00:00:00+00:00
UA06.04.05.669
First and Second Floor Unidentified Residence Building, undated
UA06.04.05.670
Topographic Map of Campus, undated
UA06.04.05.671
Access Road to New Dormitory South Tenth St., 1958-05-12T00:00:00+00:00
UA06.04.05.672
CT Scan Modifications Radiation Oncology Center ECU, 1986-11-01T00:00:00+00:00
UA06.04.05.673
Radiation Therapy Center, 1982-10-29T00:00:00+00:00
UA06.04.05.674
Addition to Radiation Therapy Center ECU, 1990-12-14T00:00:00+00:00
UA06.04.05.675
ECC Heating Plant, 1966-10-01T00:00:00+00:00
UA06.04.05.676
Alterations to Whichard Music Building, 1967-07-20T00:00:00+00:00
UA06.04.05.677
ECC Science Building, 1967-01-26T00:00:00+00:00
UA06.04.05.678
ECU Classroom Building, 1967-07-19T00:00:00+00:00
UA06.04.05.679
Dormitory for Women, 1967-01-01T00:00:00+00:00
UA06.04.05.680
ECTC Library, undated
UA06.04.05.681
ECTC Location of Pipe Tunnel, 1950-08-03T00:00:00+00:00
UA06.04.05.682
ECTC Workshop and Warehouse for Maintenance Department, 1949-11-19T00:00:00+00:00
UA06.04.05.683
ECU School of Medicine, 1978-10-10T00:00:00+00:00
UA06.04.05.684
ECTC Apartment Dorm for Teachers, 1951-02-23T00:00:00+00:00
UA06.04.05.685
ECU School of Medicine, 1978-10-10T00:00:00+00:00
UA06.04.05.686
ECTC Campus, undated
UA06.04.05.687
ECU College Hill Residence Hall Phase 1, 2006-08-31T00:00:00+00:00
UA06.04.05.688
Fire Safey Improvements Fletcher Residence Hall, Oct-5-05
UA06.04.05.689
BioTech Building, ECU Med School, 1988-06-24T00:00:00+00:00
UA06.04.05.690
ECU, Bio Tech Building Pediatric Fit Up, Aug-15-1989
UA06.04.05.691
Leo W. Jenkins Cancer Center UpFit, Feb-06-2002
UA06.04.05.692
Joyner Library Roof Replacement, Feb-20-1990
UA06.04.05.693
Classroom Building ECTC, DEC-13-1938
UA06.04.05.694
East Carolina Heating Plant, Oct-19-1966
UA06.04.05.695
ECU Slay Dormitory Renovation, April 1 2005
UA06.04.05.696
ECU VOA Site C Road, August 14 2003
UA06.04.05.697
BioTechnologyLabritory School of Medicine, December 4 1986
UA06.04.05.698
School of Allied Health Plumbing Drawing, March 18 2005
UA06.04.05.699
Flanagan Building Renovation, October 15 2007
UA06.04.05.700
School of Medicine, East Carolina University, 1978-10-10T00:00:00+00:00
UA06.04.05.701
ECU School of Medicine - HVAC Revisions, 1987-06-29T00:00:00+00:00
UA06.04.05.702
ECU School of Medicine - Rooms Revised, 1987-06-30T00:00:00+00:00
UA06.04.05.703
ECU Fine Arts Center, 1975-07-14T00:00:00+00:00
UA06.04.05.704
Field House, ECC, 1973-08-14T00:00:00+00:00
UA06.04.05.705
Leo W. Jenkins Fine Arts Center, 1975-05-02T00:00:00+00:00
UA06.04.05.706
Howard House Kitchen Renovation, 1995-09-01T00:00:00+00:00
UA06.04.05.707
Survey for ECU Street Closing For James Street and Eighth Street, 1990-10-05T00:00:00+00:00
UA06.04.05.708
Human Resources, 1991-06-05T00:00:00+00:00
UA06.04.05.709
ECC, Schematic Plan for Drainage and Rough Grading of Track and Practice Fields, 1963-05-22T00:00:00+00:00
UA06.04.05.710
Rawl Area Seating West, 1989-02-18T00:00:00+00:00
UA06.04.05.711
Mingles Coliseum West Parking Lot Drainage Additions, 1989-03-31T00:00:00+00:00
UA06.04.05.712
Proposed Addition to Graham Building, 1959-12-18T00:00:00+00:00
UA06.04.05.713
Classroom Building ECC, 1957-03-12T00:00:00+00:00
UA06.04.05.714
Elevator Tunnel Between Power House and Gym, 1950-08-02T00:00:00+00:00
UA06.04.05.715
Administration Building ECTC, 1929-07-17T00:00:00+00:00
UA06.04.05.716
Repairs to model school ECCTC, undated
UA06.04.05.717
East Wing Addition to East Dormitory, 1919-12-05T00:00:00+00:00
UA06.04.05.718
Leo Jenkins Fine Arts Center, 1975-07-23T00:00:00+00:00
UA06.04.05.719
Fire Alarm System HSC Facilities Service Office, Oct 22 2002
UA06.04.05.720
Proposed New Home Management House, undated
UA06.04.05.721
Water Mains Water and Light Commissions, 1931
UA06.04.05.722
Auxiliary Student Supply Store ECU, 1968-07-24T00:00:00+00:00
UA06.04.05.723
Renovations to four residence halls, 1990-06-01T00:00:00+00:00
UA06.04.05.724
Emergency Lighting for Jones and Aycock, January 20th, 2000
UA06.04.05.725
Generator Brick Wall and PAD Aycock Building, August 31 1995
UA06.04.05.726
Energy Modifications for six dormitories, June 15 1983
UA06.04.05.727
Renovations to six coordinator apartments, April 29 1993
UA06.04.05.728
Belk and fletcher re roofing project, September 2 1997
UA06.04.05.729
Domestic Hot Water Tank for Aycock, February 15 1999
UA06.04.05.730
Alterations, Office Suite Aycock Residence, 1995-01-01T00:00:00+00:00
UA06.04.05.731
Belk residence emergency railing repairs, 1993-08-01T00:00:00+00:00
UA06.04.05.732
Energy Conservation majors for three dorms, 1993-12-01T00:00:00+00:00
UA06.04.05.733
ECU Apartment Renovation, May 22 1995
UA06.04.05.734
Elevator upgrades Greene residence hall, September 1 2002
UA06.04.05.735
ECU Bookstore Entry Renovation, December 20 2002
UA06.04.05.736
Tyler Hall Roof Replacement, November 18 2004
UA06.04.05.737
Brewster Emergency Generator Replacement, June 15 2003
UA06.04.05.738
Elevator Upgrades- Fletcher Residence Hall, March 17 2003
UA06.04.05.739
Storm Sewer Replacement and Rehabilitation of Core Campus Mall, April 12 2003
UA06.04.05.740
ECU Freshman Parking Lot, December 10 2003
UA06.04.05.741
504 Man Dormitory ECC, May 11 1964
UA06.04.05.742
Reroofing of Clement Hall, April 8 1993
UA06.04.05.743
Belk Hall Fire Alarm Expansion, August 23 1990
UA06.04.05.744
Scott and Aycock Roof Replacement, January 27 1994
UA06.04.05.745
Aycock and Belk Residence Halls Power Upgrades, August 29 2002
UA06.04.05.746
Replace Roof Mendenhall, August 23 2000
UA06.04.05.747
Replace electrical bus duct white hall, August 13 1996
UA06.04.05.748
Residence Halls Reroofing project Fleming Residence Hall, April 13 1998
UA06.04.05.749
HVAC Controls Renovation for Fleming, March 15 1999
UA06.04.05.750
Roof replacement White residence hall, September 20 1990
UA06.04.05.751
Reroofing to white residence hall, 1994-04-01T00:00:00+00:00
UA06.04.05.752
Clement Hall Air conditioning, November 1 2002
UA06.04.05.753
Classroom improvements; technology upgrades and renovations, Brewster, March 2 2004
UA06.04.05.754
Addition of Air conditioning and Graham building, March 1 1971
UA06.04.05.755
Landscape Site Plan Graham Building, November 30 1992
UA06.04.05.756
Leo Jenkins Fine Arts Center HVAC Improvements, April 2 2002
UA06.04.05.757
Cooling Tower Replacement Fletcher Music Center, August 5 1997
UA06.04.05.758
Replace Tyler and Mary Greene Dormitory Roofs, August 16 1985
UA06.04.05.759
Fletcher Recital Hall Renovation, March 11 1998
UA06.04.05.760
Window Replacement Slay and Umstead Dorms, May 20 1988
UA06.04.05.761
Garrett and Scott Hall Courtyards, June 2 1995
UA06.04.05.762
Boundary and top of graphic survey for state of NC (ECU), June 12 1997
UA06.04.05.763
Fire Alarm Upgrade Fleming Residence, April 5 1999
UA06.04.05.764
Fleming Dormitory Renovation, 1984-02-01T00:00:00+00:00
UA06.04.05.765
Subway, December 9 2003
UA06.04.05.766
Air Conditioning/Electrical Upgrades Jones Hall, September 19 2002
UA06.04.05.767
Interior renovations to Garrett Residence Hall, February 17 2004
UA06.04.05.768
Garrett Hall Lobby Renovations, June 2 2004
UA06.04.05.769
Fletcher Music Library Renovations, September 17 1992
UA06.04.05.770
Slay and Umstead Site Improvements Phase 1, September 7 1995
UA06.04.05.771
Renovations to Scott Dormitory, March 9 1992
UA06.04.05.772
Dormitory for Women, ECC, 1965-01-01T00:00:00+00:00
UA06.04.05.773
Fire/Safety Modifications Fletcher Music Building, 1995-05-01T00:00:00+00:00
UA06.04.05.774
Roof Repairs Belk and Fletcher Dorms, June 4 1980
UA06.04.05.775
Topographic Survey of Slay Hall and Umstead Hall, April 5 1991
UA06.04.05.776
Garrett Residence Hall Power Upgrades, September 17 2000
UA06.04.05.777
North Basement Fletcher Hall, February 10 1987
UA06.04.05.778
Asbestos abatement project slay hall and Umstead hall, March 29 1993
UA06.04.05.779
BioEnergetics Building Minges Annex, May 15 2003
UA06.04.05.780
Addition to Woodall/Smart Office Building, January 23 1979
UA06.04.05.781
Office Building (Smart/Woodall), August 12 1969
UA06.04.05.782
Mendenhall Student Center Spot Entrance Renovation, April 8 2003
UA06.04.05.783
Fletcher Residence Hall Reroof, June 7 2001
UA06.04.05.784
SciTech Global Classroom Wiring Schematic, May 14 2003
UA06.04.05.785
Fletcher Hall Lobby Renovation, January 31 2002
UA06.04.05.786
Joyner 2301 Office Renovation, April 2 2001
UA06.04.05.787
Topographic Survey Cotten Hall, April 28 2004
UA06.04.05.788
Fire Alarm Upgrade White Residence Hall, January 3 2003
UA06.04.05.789
Campus Computing Center Renovations and Additions, March 4 2003
UA06.04.05.790
ECU Health Center Addition and Renovation, July 28 1998
UA06.04.05.791
Fire Alarm Upgrade White Residence Hall, May 8 2003
UA06.04.05.792
Old Cafeteria Complex Chilled Water Mods, August 9 2002
UA06.04.05.793
East Carolina University School of Medicine Brody Building, September 12 1985
UA06.04.05.794
Elevator, Education and Psychology Building, August 10 1977
UA06.04.05.795
Speight Building Cooling Tower Replacement, August 20 1999
UA06.04.05.796
Reroofing Minges Collesium and School of Medicine, Gutter Repairs at WH Ragsdale, Career Services and Howard House, May 22 1996
UA06.04.05.797
Sidewalk Improvements Greene Residence Hall, May 31 1990
UA06.04.05.798
Site Plan for Greene Residence Hall, undated
UA06.04.05.799
Speight Building HVAC Improvements, 1994-01-01T00:00:00+00:00
UA06.04.05.800
Reservations, Information Inticiting counters renovation, April 7 2003
UA06.04.05.801
Student Bookstore Renovation, August 14 1992
UA06.04.05.802
Registers Office Renovation, December 23 1993
UA06.04.05.803
Reroofing of Scales Field House, March 18 1993
UA06.04.05.804
Reroofing of Pirate Club Building, April 2 1993
UA06.04.05.805
Roof Replacement, Old Section at Old Scales Building, April 17 1991
UA06.04.05.806
Wright Building HVAC Study, July 13 1999
UA06.04.05.807
Brody Building Room Control, February 29 1988
UA06.04.05.808
ECU Brody Parking Lot C, September 26 2001
UA06.04.05.809
Module F Renovation School of Medicine, November 18 1988
UA06.04.05.810
Roof Replacement Stem Plant Building Brody School of Medicine, 2000-01-01T00:00:00+00:00
UA06.04.05.811
Willis Building Fire Alarm System, July 3 2001
UA06.04.05.812
Chancellor Suite Renovation, September 3 1999
UA06.04.05.813
Brody Building Modifications Phase 2, January 15 1985
UA06.04.05.814
School of Medicine D Module, February 12 1988
UA06.04.05.815
Life Sciences Renovation, March22 2004
UA06.04.05.816
Roof Replacement, Old Science Building, 1999-09-01T00:00:00+00:00
UA06.04.05.817
School of Medicine, Vivarium Building, 1987-02-01T00:00:00+00:00
UA06.04.05.818
Bethel Clinic Modifications, February 10 1986
UA06.04.05.819
Renovation and alteration, DEC Satellite Building, 1999-05-01T00:00:00+00:00
UA06.04.05.820
Elevator Upgrades Tyler Residence Hall, October 16 2000
UA06.04.05.821
ECU Medical School Chiller Edition, April 13 1982
UA06.04.05.822
ECU-MRI, December 8 1986
UA06.04.05.823
MRI Medical Gas System, School of Medicine, March 10 1997
UA06.04.05.824
Brody Building 6th floor, December 31 1985
UA06.04.05.825
School of Medicine, New Store Front Entrance; out patient center, March 17 1987
UA06.04.05.826
HVAC Work Brody Building, 1986-08-01T00:00:00+00:00
UA06.04.05.827
Brody Building Completion of 6th floor HVAC Work, 1985-10-01T00:00:00+00:00
UA06.04.05.828
ECU Medical School 7th floor Renovation, April 25 1986
UA06.04.05.829
Croatan Snack Shop, February 7 1991
UA06.04.05.830
Brewster, Flanagan, and Rawl building Improvements, 1984-09-01T00:00:00+00:00
UA06.04.05.831
General Classroom Building Outdoor Walkway, June 5 1990
UA06.04.05.832
School of Buisness/General Classroom Building, May 18 1992
UA06.04.05.833
ECU Electrical Distrubition System Renovation, 1985-08-01T00:00:00+00:00
UA06.04.05.834
Reroof Brewster Building, June 10 1993
UA06.04.05.835
Toilet Partitions for Brewster, December 14 1992
UA06.04.05.836
Career Services Office, October 8 1993
UA06.04.05.837
Classroom Upgrades, December 4 1998
UA06.04.05.838
Todd Dining Hall HVAC Renovations, December 23 1998
UA06.04.05.839
10th Street Parking Lot Storm Drainage Improvements, March 22 1996
UA06.04.05.840
Parking Facilities, April 17 1980
UA06.04.05.841
10th Street Padestrian Crossing, February 10 1995
UA06.04.05.842
Campus Street Improvements, 1989-03-01T00:00:00+00:00
UA06.04.05.843
Jarvis Street, April 25 1991
UA06.04.05.844
3rd floor edition to Health Science Library and Renovation to 3rd floor of Brody Building, August 15 1988
UA06.04.05.845
ECU Electrical Distribution System Renovation, 1979-06-01T00:00:00+00:00
UA06.04.05.846
Chiller/Cooling Tower Replacement Project for Rivers, Belk Allied Health, and Irons Building, August 10 1997
UA06.04.05.847
Todd Dining Hall, January 31 1992
UA06.04.05.848
Cupola Schematic Concept, November 2 2009
UA06.04.05.849
Renovation and Alteration DEC Satellite Building, 1999-09-01T00:00:00+00:00
UA06.04.05.850
Fletcher Music Parking Lot Drainage Improvements, February 7 2002
UA06.04.05.851
Elevator Renovation Mendenhall, March 18 2004
UA06.04.05.852
Austin Elevator Addition, August 6 1999
UA06.04.05.853
Department of Speech Language and Auditory pathology, July 22 1993
UA06.04.05.854
School of Medicine Health Sciences Library, December 16 1986
UA06.04.05.855
Renovation of the Brody Building Clinic, April 21 1995
UA06.04.05.856
Leo. W. Jenkins Fine Arts Center HVAC Alterations, October 25 1995
UA06.04.05.857
Cotten Hall Window and Door Replacement, July 15 2002
UA06.04.05.858
Renovations to the Blunt Building, February 11 1998
UA06.04.05.859
Modulare Classroom Unit, February 20 1997
UA06.04.05.860
General Classroom Building, April 30 1985
UA06.04.05.861
Dowdy Ficklan Stadium Score Board Area Improvements, May 19 2000
UA06.04.05.862
Downey Ficklan Stadium Parking Lot, 1998-03-01T00:00:00+00:00
UA06.04.05.863
Strength and Conditioning Center, January 14 2000
UA06.04.05.864
Dowdy Ficklan Stadium Expansion, September 13 1996
UA06.04.05.865
Club Level Seating Phase 1 and 2 Dowdy Ficklan Stadium, September 4 1998
UA06.04.05.866
Repairs to Ficklan Memorial Stadium, August 26 1991
UA06.04.05.867
Ficklan Stadium Renovations to Toilet rooms and visiting team locker room, January 12 2006
UA06.04.05.868
Ficklan Stadium Remediation of Precast Concrete Rails, September 20 2005
UA06.04.05.869
ECU Football Stadium Humidity Resolution, August 4 2005
UA06.04.05.870
Ficklan Stadium Phase 3 Maintainence Repairs, September 11 2006
UA06.04.05.871
Dowdy Ficklan Stadium Phase 3 Electrical Upgrades, September 8 2006
UA06.04.05.872
Ficklan Memorial Stadium Phase 2 Repairs, October 22 1992
UA06.04.05.873
Strength and Conditioning Center, January 14 2000
UA06.04.05.874
Classroom Building for Home of Economics, January 12 1967
UA06.04.05.875
Renovation of the Brody Building Clinics, February 9 1996
UA06.04.05.876
ECU School of Medicine First Floor Sprinklers, April 16 1979
UA06.04.05.877
ECU School of Medicine Wast Incinerator Edition, February 5 1997
UA06.04.05.878
ECU 14th Street Warehouse, September 26 2000
UA06.04.05.879
Fire Alarm System Replace and Upgrade' Howell SciTech, 1992-10-01T00:00:00+00:00
UA06.04.05.880
Upgrade Academic Building Speight, January 28 1997
UA06.04.05.881
Renovations to Joyner Library Roof Plan, April 27 1976
UA06.04.05.882
Gray Gallery Renovation Jenkins Arts Center, January 7 1999
UA06.04.05.883
Chiller Replacement for Rawl Building, July 12 1995
UA06.04.05.884
Upgrade Academic Building HESC Preschool, April 29 1996
UA06.04.05.885
Sound System Wright Auditorium, December 6 1990
UA06.04.05.886
Upgrade Academic Building Bate/Belk, November 4 1999
UA06.04.05.887
Fletcher Hall Door Replacement, August 30 2005
UA06.04.05.888
Messick Art Center/McGinnis Fire Alarm Replacement, April 12 2006
UA06.04.05.889
Health Science Library Staff Entrance, April 25 1991
UA06.04.05.890
Preliminary Plan Professional Center Section 3, October 11 1978
UA06.04.05.891
Door Security System Medical School, May 14 1985
UA06.04.05.892
ECU School of Medicine Special Project 8029, January 25 1988
UA06.04.05.893
ECU School of Medicine Special Project 8023, March 17 1988
UA06.04.05.894
ECU School of Medicine Special Project 4th floor Brody Building, March 4 1988
UA06.04.05.895
ECU School of Medicine MCNC Special Project, December 2 1987
UA06.04.05.896
ECU School of Medicine microphone stand for 2E92, October 3 1988
UA06.04.05.897
ECU School of Medicine Shelf Units for 2517, 1988-10-01T00:00:00+00:00
UA06.04.05.898
ECU School of Medicine Project Gamma Completion of laboratories, March 3 1983
UA06.04.05.899
ECU School of Medicine Casework Demolition 4th floor Brody Building, September 16 1987
UA06.04.05.900
ECU School of Medicine Project Alpha completion of 2nd and 4th floor of Brody building, 1983-12-01T00:00:00+00:00
UA06.04.05.901
ECU School of Medicine Project Epsilon Mechanical Improvements to 3w21, 3w40, and 3w42 Brody Building, June 10 1982
UA06.04.05.902
ECU School of Medicine Driveway for electrical service, October 20 1988
UA06.04.05.903
ECU School of Medicine additional casework 5w47, 1988-08-01T00:00:00+00:00
UA06.04.05.904
Elevator Systems ECU Life Sciences Building, July 23 1996
UA06.04.05.905
ECU School of Med Special Project 7016, September 5 1986
UA06.04.05.906
ECU School of med completion of 4 labs in BioTech Building, October 3 1988
UA06.04.05.907
ECU School of Med Special Project 6019, March 25 1986
UA06.04.05.908
ECU School of Medicine Sperical Project 6017, February 6 1985
UA06.04.05.909
ECU School of Medicine Special Project 7004, July 2 1986
UA06.04.05.910
ECU School of Medicine Special Project 6003, July 22 1986
UA06.04.05.911
ECU school of med Special Project 8001, July 7 1987
UA06.04.05.912
ECU School of Med Special Project 7015, August 11 1986
UA06.04.05.913
ECU School of Med Special Project 8005, August 26 1987
UA06.04.05.914
ECU School of Med Special Project 7027, January 7 1987
UA06.04.05.915
ECU School of Med Special Project 8002, July 10 1987
UA06.04.05.916
ECU School of Med Special Project 8010, October 21 1987
UA06.04.05.917
ECU School of Med Special Project 7032, February 18 1987
UA06.04.05.918
ECU School of Med Special Project Case work 3rd floor Brody Building, September 10 1987
UA06.04.05.919
ECU School of Med Special Project Wall insulation medical records, June 10 1988
UA06.04.05.920
ECU School of Medicine Utility Plant Converting Boilers, July 21 1987
UA06.04.05.921
Central Heating Plant Improvements for ECC, March 7 1958
UA06.04.05.922
Wright Auditoriam Mechanical Room Cooling, January 11 1999
UA06.04.05.923
Lighting Improvements Practice Football Field, June 19 1990
UA06.04.05.924
ECU Roof Repairs and Replacements, July 16 1988
UA06.04.05.925
Wright Soda Shop, January 15 1991
UA06.04.05.926
Tyler Hall Revisions and Replacements, April 12 2002
UA06.04.05.927
Lighting Improvements East Carolina Teachers College, November 7 1949
UA06.04.05.928
Admissions Whichard Building, March 14 1990
UA06.04.05.929
Proposed renovations to Wright snack shop, February 23 1996
UA06.04.05.930
Topographic Survey of Wright Place, May 12 1997
UA06.04.05.931
Wright Place Building Plans, February 23 1996
UA06.04.05.932
Wright Building Renovations, April 2 1986
UA06.04.05.933
Wright Auditoriam/Building, August 2 1991
UA06.04.05.934
Renovation of Wright Building, March 26 1981
UA06.04.05.935
Replace Roofs Phase 3, July 1 1986
UA06.04.05.936
ECU Repair and Replacement of Roof, January 15 1983
UA06.04.05.937
Classroom Improvements Technology Upgrades and Renovations Austin, July 11 2003
UA06.04.05.938
Alteration to Med School Facilities, 1986-07-01T00:00:00+00:00
UA06.04.05.939
ECU School of Medicine, November 19 1977
UA06.04.05.940
School of Medicine Health Sciences Library, September 12 1988
UA06.04.05.941
ECU Steam Plant Upgrade Boiler 1 and 2, October 1 1997
UA06.04.05.942
ECU Tennis Court Lighting, July 1 2001
UA06.04.05.943
ECU Steam Plant Upgrade Boiler Number 3, June 22 2000
UA06.04.05.944
Lab Fit Up Science and Industrial Technology Building, January 19 2005
UA06.04.05.945
Library ECTC, April 7 1950
UA06.04.05.946
Intramural Sports Complex Lighting Edition, May 1 2002
UA06.04.05.947
Wright Building Renovation Phase 2, February 23 1997
UA06.04.05.948
ECU Steam Distribution Upgrades Phase 2, November 2 2000
UA06.04.05.949
Boiler Feed Water Line Replacement, July 17 1997
UA06.04.05.950
Strength and Conditioning Center Construction Drawings, January 14 2000
UA06.04.05.951
Topographic Survey ECU College Hill Drive, May 22 2003
UA06.04.05.952
ECU Main Campus Lighting Improvements, 1990-06-01T00:00:00+00:00
UA06.04.05.953
Proposed Renovations Wright Snack Shop, July 24 1990
UA06.04.05.954
Additions and Renovations to ECU Heating Plant, 1974-08-01T00:00:00+00:00
UA06.04.05.955
ECU Steam Distribution Upgrades, May 8 2002
UA06.04.05.956
Old Cafeteria Renovation, April 11 2005
UA06.04.05.957
ECU Fletcher and Tyler Dormitory Conditioning Installation, December 1 2004
UA06.04.05.958
Howell Science/GCB Mechanical/ Electrical Replacement and Flood Gate Installation, June 6 2000
UA06.04.05.959
Boundary and Topographic Survey of ECU Arlington Extension, September 27 2002
UA06.04.05.960
Jarvis Hall Renovations, June 12 1998
UA06.04.05.961
ECU School of Medicine Circuit Breaker and Transfer Switch Distribution, Marc 28 1979
UA06.04.05.962
Membrane Roof Replacement Student Rec Center, June 11 2012
UA06.04.05.963
Tyler Residence Hall Renovation Exterier, November 1 2011
UA06.04.05.964
ECU Materials Warehouse, May 26 2000
UA06.04.05.965
Joyner Library Addition and Renovation First Floor Composite, September 25 1992
UA06.04.05.966
ECU Rivers Building Elevator Modernization, September 11 2006
UA06.04.05.967
Fire Alarm Upgrade Greene Residence Hall, October 7 2004
UA06.04.05.968
Medical Pauvilion Roof Replacement, October 6 2006
UA06.04.05.969
Aycock Residence Hall Basement Renovation, December 22 2004
UA06.04.05.970
Location Survey for Epps Maintaninence Complex, March 7 2001
UA06.04.05.971
Clement Residence Hall Emergency Fire Repairs, May 12 2006
UA06.04.05.972
Epps Facility Emergency Standby Generator, November 18 2000
UA06.04.05.973
Door Security System Med School, May 14 1985
UA06.04.05.974
ECU School of Medicine Special Project First Floor B Module, undated
UA06.04.05.975
ECU Brody Vice Chancellor Office Up Fit, July 22 2002
UA06.04.05.976
ECU Flanagan Update, December 21 2004
UA06.04.05.977
Floor Covering Renovation ECU School of Medicine, June 27 2000
UA06.04.05.978
ECU Flanagan Building Renovation, January 31 2005
UA06.04.05.979
School of Medicine ECU, October 10 1978
UA06.04.05.980
Graham Building Fire Alarm System, January 28 2008
UA06.04.05.981
MR Unit School of Medicine ECU, July 19 1985
UA06.04.05.982
Choir Safety Improvements Fletcher Residence Hall, October 5 2005
UA06.04.05.983
Administrative Support Annex, July 9 2008
UA06.04.05.984
Elevator Upgrades White Hall, September 1 2004
UA06.04.05.985
ECU School of Medicine General Plot Plan, June 1 1988
UA06.04.05.986
School of Medicine ECU Phase 2, November 14 1977
UA06.04.05.987
ECU STEM Plan Boiler 4 Repairs, October 10 2008
UA06.04.05.988
STEM Plant Upgrades De-alkalizer, April 3 2005
UA06.04.05.989
Fire Alarm Upgrades Jones and Garrett, October 10 2007
UA06.04.05.990
Second Floor Brody Building Renovation, March 20 2008
UA06.04.05.991
Belk Residence Hall Air Conditioning Upgrades, October 12 2007
UA06.04.05.992
Fire Alarm System Fletcher Residence Hall, March 16 2006
UA06.04.05.993
Phase 2 SciTech Building Volume 1, January 2 2001
UA06.04.05.994
Phase 2 SciTech Building Volume 2, January 2 2001
UA06.04.05.995
Phase 2 SciTech Building Volume 3, January 2 2001
UA06.04.05.996
Phase 2 SciTech Building Volume 4, January 2 2001
UA06.04.05.997
Phase 2 ScitTech Building Volume 5, January 2 2001
UA06.04.05.998
Administration Building ECTC, July 17 1929
UA06.04.05.999
Dormitory for 500 students, December 11 1967
UA06.04.05.1000
Leo Jenkins Fine Arts Center, 1975-08-01T00:00:00+00:00
UA06.04.05.1001
Plumbing Improvements Ragsdale Hall, August 12 1952
UA06.04.05.1002
Radiation Therapy Center, July 8 1983
UA06.04.05.1003
MR Unit, January 16 1986
UA06.04.05.1004
ECU Speight Emergency Generator, January 5 2007
UA06.04.05.1005
Renovation to Lab Suite Brody Building, October 21 1997
UA06.04.05.1006
3rd floor addition to heal science library and renovation to 3rd floor of Brody building, March 18 1988
UA06.04.05.1007
New classroom for Education and Psycholy departments, November 20 1963
UA06.04.05.1008
Addition to Administration Building, 1957-08-01T00:00:00+00:00
UA06.04.05.1009
East Carolina College Science Building, undated
UA06.04.05.1010
Lobby Addition and Alterations for Sleight Dormitory, June 15 1960
UA06.04.05.1011
ECU Energry Modifications for 6 Dormitories, June 15 1983
UA06.04.05.1012
Flooring and Equipment for Snack Bar, February 3 1976
UA06.04.05.1013
Converting Old Library to Music Building, June 1 1954
UA06.04.05.1014
Conversion of Tyler Dormitory, April 30 1971
UA06.04.05.1015
Lighting Improvements ECTC, November 7 1949
UA06.04.05.1016
New Floor System for Jarvis Hall Bathroom Renovation, July 19 1964
UA06.04.05.1017
Renovations and Additions to Wahl-Coats Drama Facility, July 28 1975
UA06.04.05.1018
Partial Plot Plan ECTC, July 17 1929
UA06.04.05.1019
Reconstruction of the parking facilities east 10h street and college hill drive, undated
UA06.04.05.1020
Panelouvre Model for Jenkins Fine Arts Center, June 23 1975
UA06.04.05.1021
Leo W. Jenkins FIne Arts Center, December 5 1963
UA06.04.05.1022
1953 Men's Dormitory, November 15 1953
UA06.04.05.1023
Music Building ECC, January 19 1965
UA06.04.05.1024
Addition to Radiation Therapy Center, September 14 1990
UA06.04.05.1025
3rd floor addition to heal science library and renovation to 3rd floor of Brody building, March 18 1988
UA06.04.05.1026
Brewster Classroom Building, April 16 1968
UA06.04.05.1027
Proposed Revisions Wright Building, undated
UA06.04.05.1028
School of Medicine ECU, October 10 1978
UA06.04.05.1029
Radiation Therapy Center, October 29 1982
UA06.04.05.1030
Addition to Radiation Therapy Center, December 14 1990
UA06.04.05.1031
ECU Allied Health Project, January 8 2005
UA06.04.05.1032
Coordination Electrical Plan, November 29 2004
UA06.04.05.1033
School of Allied Health Services' Composite, Duct, drawing, January 6 2005
UA06.04.05.1034
Joyner Library Addition & Renovation, October 29 1993
UA06.04.05.1035
Joyner Library Addition & Renovation, October 29 1993
UA06.04.05.1036
Joyner Library Addition & Renovation, October 29 1993
UA06.04.05.1037
Joyner Library Addition & Renovation, October 29 1993
UA06.04.05.1038
Joyner Library Addition & Renovation, October 29 1993
UA06.04.05.1039
Joyner Library Addition & Renovation, October 29 1993
UA06.04.05.1040
Joyner Library Addition & Renovation, October 29 1993
UA06.04.05.1041
Joyner Library Addition Renovation, October 20 1995
UA06.04.05.1042
ECU Wright Plaza Tree Well Design, October 3 1988
UA06.04.05.1043
Renovations Addition and Alterations to Wright Building, February 15 1962
UA06.04.05.1044
Addition and Alteration to Wright Building, February 16 1964
UA06.04.05.1045
ECU UNC Coastal Studies Institute, November 15 2010
UA06.04.05.1046
School of Medicine ECU, October 10 1978
UA06.04.05.1047
ECU Storage Building 214, February 25 2011
UA06.04.05.1048
ECU School of Dentisty Package 2 Volume 2, December 8 2010
UA06.04.05.1049
Brody School of Medicine Roof Replacement, June 21 2007
UA06.04.05.1050
Joyner Library Addition and Renovation, July 20 1995
UA06.04.05.1051
ECU School of Dentistry Package 2, December 8 2010
UA06.04.05.1052
ECU UNC Coastal Studies Institute Volume 2, November 15 2010
UA06.04.05.1053
Survey of Blount Property 10th street, February 24 1984
UA06.04.05.1054
Institutional Advancement Office HVAC Rooftop Units, September 30 1997
UA06.04.05.1055
The Birthing Center, November 17 1986
UA06.04.05.1056
Joyner Library Addition Renovation Furniture Equipment Plan, October 29 1993
UA06.04.05.1057
ECU School of Dentistry Package 1, December 8 2010
UA06.04.05.1058
Brody Medical Sciences Building Pump Replacement, April 23 2013
UA06.04.05.1059
Wright Circle Infrastructue Improvements Phase 2, June 5 2009
UA06.04.05.1060
Trustees Fountain, March 10 2006
UA06.04.05.1061
Eastern Carolina Cardiovascular Institure, March 4 2011
UA06.04.05.1062
Joyner Library Renovation, October 20 1995
UA06.04.05.1063
Ward Sports Medicine Roof Replacement, June 13 2012
UA06.04.05.1064
ECU School of Dentistry Package 1, June 18 2010
UA06.04.05.1065
ECU School of Dentistry Package 2, November 1 2012
UA06.04.05.1066
Joyner Library Addition and Renovation, October 20 1995
UA06.04.05.1067
Fire Alarm System HSC Facilties Service Office, October 22 2002
UA06.04.05.1068
Water Mains Greenville North Carolina, 1931
UA06.04.05.1069
Proposed New Home Management House ECTC, undated
UA06.04.05.1070
Repairs to model school ECCTS, N.D
UA06.04.05.1071
East Wing Edition to East Dormitory, December 5 1919
UA06.04.05.1072
Leo W. Jenkins Fine Arts Center, July 23 1975
UA06.04.05.1073
Administration Building ECTC, July 17 1929
UA06.04.05.1074
UNC Coastal Studies Institute Volume 1 Research Building, November 15 2010
UA06.04.05.1075
Belk Residence Hall, June 1 1994
UA06.04.05.1076
Tyler Residence Hall Renovation Exterior, October 31 2012
UA06.04.05.1077
Topographic Map of East Carolina Annex, 1953-08-01T00:00:00+00:00
UA06.04.05.1078
Warren Life Science Fire Alarm Replacement Repair, February 10 2014
UA06.04.05.1079
Renovation of Electrical Distribution System, 1968-06-01T00:00:00+00:00
UA06.04.05.1081
Second Edition to Joyner Library, August 22 1968
UA06.04.05.1082
Edtions and Alterations to Joyner Library, February 5 1964
UA06.04.05.1083
Library Edition, October 6 1972
UA06.04.05.1084
Renovations to Joyner Library, March 3 1975
UA06.04.05.1085
UNC Coastal Institute Volume 1 Research Building, November 15 2010
UA06.04.05.1086
Map of ECTC, 1946
UA06.04.05.1087
Ficklen Stadium Seats, undated
UA06.04.05.1088
Building Site Survey 3rd men's dormitory, 1960-08-01T00:00:00+00:00
UA06.04.05.1089
Building Alteration and Installation of Air Conditioning in the Flanagan Building, 1969-05-01T00:00:00+00:00
UA06.04.05.1090
Fire Safety Improvements Tyler Residence Hall, march 10 2000
UA06.04.05.1091
Heating Asparatis in girls dormitory ECTC, May 15 1922
UA06.04.05.1092
Renovation of Medical Pavilion Suite 1, 2001-03-01T00:00:00+00:00
UA06.04.05.1093
Animal Research Facility Plant, June 19 1978
UA06.04.05.1094
ECU School of Medicine Parking Lot improvements, March 17 1993
UA06.04.05.1095
ECU Health Science Library 1st Floor, December 20 2001
UA06.04.05.1096
Rawl Steam Line Relocation, November 11 1997
UA06.04.05.1097
Rawl Building and Old Cafetira Transformer Replacement, March 10 2000
UA06.04.05.1098
Leo W. Jenkins Fine Arts Center, 1996-10-01T00:00:00+00:00
UA06.04.05.1099
Minges Pool Filter, August 22 1997
UA06.04.05.1100
Minges Colisseum Lighting System, September 14 1988
UA06.04.05.1101
Renovations to Jenkins Fine Arts Center "Senior Art Gallery", May 5 1993
UA06.04.05.1102
Old Cafeteria Renovations, 1997-01-01T00:00:00+00:00
UA06.04.05.1103
Renovations Joyner Library Sound Room, January 20 1976
UA06.04.05.1104
Telecommunications Center Joyner Library, January 2 1991
UA06.04.05.1105
Joyner Library Roof Repair, November 4 1991
UA06.04.05.1106
Television Studio Joyner Library, June 15 1993
UA06.04.05.1107
Preliminary Site Plan Speech Audiology Buildings, May 10 1993
UA06.04.05.1108
University Cashiers Office Renovation, March 29 1999
UA06.04.05.1109
ECU Parking Lot Lighting, November 10 1988
UA06.04.05.1110
Condinsate Line Replacement and Abestas Abatement, July 13 1994
UA06.04.05.1111
Renovation to Rawl Psychological Labs, February 1 1993
UA06.04.05.1112
Roof Repairs and Alterations to the Old North Cafeteria, May 18 1984
UA06.04.05.1113
Fire and Smoke Alarm System, January 9 1981
UA06.04.05.1114
Library ECC, September 9 1953
UA06.04.05.1115
ECU Computer Center Fire Protection, March 12 1984
UA06.04.05.1116
Central Motor Pool Fence, August 20 1993
UA06.04.05.1117
Brewster 104, July 2 1992
UA06.04.05.1118
Revisions to Howard House, June 22 1982
UA06.04.05.1119
Topographic Survey South Side of Graham Building, January 7 1960
UA06.04.05.1120
Addition to Radiation Therapy Center, December 14 1990
UA06.04.05.1121
Radiation Therapy Revisions and Alterations, July 8 1983
UA06.04.05.1122
Boiler Feed Water Line Replacement, July 17 1997
UA06.04.05.1123
First Floor Plan, undated
UA06.04.05.1124
Registrars Office, undated
UA06.04.05.1125
Renovations to HESC Building (Rivers), May 1 1997
UA06.04.05.1126
ECU Austin Building, Roof Moisture Survey, 1982-09-01T00:00:00+00:00
UA06.04.05.1127
Classroom Building, April 16 1968
UA06.04.05.1128
Radiation Therapy Center Addition, September 21 1990
UA06.04.05.1129
North "C" Elevator Wiring, October 30 1992
UA06.04.05.1130
Science Building, East Carolina College, undated
UA06.04.05.1131
Brody Fire Project, October 10 1978
UA06.04.05.1132
Library, ECC, Greenville, NC, December 29 1954
UA06.04.05.1133
Topographic Map of East Carolina College Annex, 1953-08-01T00:00:00+00:00
UA06.04.05.1134
A Map of East Carolina College, 1956-01-01T00:00:00+00:00
UA06.04.05.1135
Classroom Building, ECTC, December 13 1938
UA06.04.05.1136
Joyner Library Addition & Renovation, January 3 1992
UA06.04.05.1137
Remodeling Existing Dietary Department, March 20 1955
UA06.04.05.1138
Joyner Library Furniture Design, undated
UA06.04.05.1139
Joyner Library Addition & Renovation, October 20 1995
UA06.04.05.1140
Home Management House for ECTC, December 15 1950
UA06.04.05.1141
Library, ECTC, December 28 1950
UA06.04.05.1142
Building Alteration and Installation of Air Conditioning in the Flanagan Building, 1969-03-01T00:00:00+00:00
UA06.04.05.1143
East Dormitory ECTC, August 20 1927
UA06.04.05.1144
Addition & Alterations, Dietary Department, October 25 1957
UA06.04.05.1145
Property Line Location: ECU School of Medicine, Moye Blvd, June 12 2002
UA06.04.05.1146
Renovation to Lab Suite Brody Building, October 22 1997
UA06.04.05.1147
Brody Building Modifications Phase 2, January 14 1984
UA06.04.05.1148
Brody Building Room Control, February 29 1988
UA06.04.05.1149
ECU School of Medicine, Parking Lot Improvements, March 17 1993
UA06.04.05.1150
ECU Brody Parking Lot C, September 26 2001
UA06.04.05.1151
ECU School of Medicine: New Storefront Entrance: Outpatient Center, March 17 1987
UA06.04.05.1152
ECU School of Medicine: Special Project - 1st Floor - B Module - OB-GYN - Brody Building, undated
UA06.04.05.1153
Module F Renovation School of Medicine, September 8 1998
UA06.04.05.1154
ECU - MRI, December 8 1986
UA06.04.05.1155
ECU School of Medicine - Card Reader/Riot Panels, April 24 1987
UA06.04.05.1156
ECU School of Medicine: Special Project 8030: Casework: D Module - Psychiatry - Brody Building, February 12 1988
UA06.04.05.1157
ECU Medical School - Chiller Addition, April 13 1982
UA06.04.05.1158
Laundry Addition to ECTC, December 10 1938
UA06.04.05.1159
Workshop & Warehouse for Maintenance Department, August 4 1949
UA06.04.05.1160
School of Allied Health Sciences, School of Nursing, and Health Sciences Library, August 1 2007
UA06.04.05.1161
Renovations & Additions to Wahl-Coates Drama Facility, October 5 1979
UA06.04.05.1162
Shop Unit "E" Wahl-Coates Drama Facility, March 20 1981
UA06.04.05.1163
Additions & Renovations to Wahl-Coates Drama Facility, October 27 1980
UA06.04.05.1164
Evaluation Clinic & Day Care Center, ECU, July 22 1968
UA06.04.05.1165
Building Alteration and Installation of Air Conditioning in the Flanagan Building, 1969-03-01T00:00:00+00:00
UA06.04.05.1166
Additions to Minges Coliseum, November 5 1981
UA06.04.05.1167
Reroofing Project: Minges Coliseum Pool Area, Flanagan, and Whichard Building, June 1 1978
UA06.04.05.1168
Men's Health & Physical Education Building, June 10 1964
UA06.04.05.1169
Lighting Improvements ECTC, September 25 1950
UA06.04.05.1170
Proposed Rewiring of Light & Power System, ECTC, May 20 1937
UA06.04.05.1171
Electrical Distribution System, ECTC, November 1 1949
UA06.04.05.1172
Plat of Connections of Pipe Line to Sanitary Drinking Fountains, ECTTS, October 4 1913
UA06.04.05.1173
Parking and Drive's New Dormitory, ECTC, January 26 1950
UA06.04.05.1174
New Heating Plant, undated
UA06.04.05.1175
ECC Heating Plant, 1966-10-01T00:00:00+00:00
UA06.04.05.1176
Renovation of Electrical Distribution System, 1968-06-01T00:00:00+00:00
UA06.04.05.1177
Classroom Building, ECU, April 16 1968
UA06.04.05.1178
School of Medicine, Key and Site Plans, Phase I, September 21 1977
UA06.04.05.1179
Science Building for Biology & Physics, ECC, January 26 1967
UA06.04.05.1180
Joyner Library Floor Plans, undated
UA06.04.05.1181
Joyner Library Exterior Drawings, undated
UA06.04.05.1182
Joyner Library Addition & Renovation, Project 754: Final Set, September 25 1992
UA06.04.05.1183
Joyner Library Addition & Renovation, Project 754: Early Set, April 9 1992
UA06.04.05.1184
Joyner Library Addition & Renovation, Project 754.5: Furniture Plan, July 20 1995
UA06.04.05.1185
Joyner Library Addition & Renovation, Project 754: Early Furniture Plan, November 4 1991
UA06.04.05.1186
Joyner Library Floor Plans, July 26 1994
UA06.04.05.1187
Joyner Library Addition & Renovation: Library Drive Improvements, August 26 1996
UA06.04.05.1188
Joyner Library Addition & Renovation: Floor Plan & Architectural Designs, 1990
UA06.04.05.1189
Joyner Library Addition & Renovation, Project 754: Final Set, September 25 1992
UA06.04.05.1190
Dormitory for Men, August 1 1958
UA06.04.05.1191
Allied Health Professionals Building, August 1 1970
UA06.04.05.1192
Additions to Allied Health Professtionals Building, 1975-04-01T00:00:00+00:00
UA06.04.05.1193
Interim Medical Library Facility, February 25 1976
UA06.04.05.1194
Home Management House for ECTC, December 15 1950
UA06.04.05.1195
Topographic Survey Being the Southeast Corner of Reade Circle and Fifth Street, undated
UA06.04.05.1196
South Cafeteria Building, May 3 1961
UA06.04.05.1197
Remodeling of Main Cafeteria Building, February 5 1966
UA06.04.05.1198
Renovation North Cafeteria, ECC, September 22 1959
UA06.04.05.1199
Dining Hall & Kitchen, ECTC, August 19 1927
UA06.04.05.1200
Renovations to Roof, Front Wing of Cafeteria, ECC, 1955-07-01T00:00:00+00:00
UA06.04.05.1201
Additions & Alterations, Dietary Department, October 25 1957
UA06.04.05.1202
New Retaining Wall, ECU, March 3 1969
UA06.04.05.1203
Dormitory for Women, 1969
UA06.04.05.1204
Cotton Dormitory, 1985-03-01T00:00:00+00:00
UA06.04.05.1205
Health and Physical Education Building, November 21 1949
UA06.04.05.1206
An Addition to Ficklen Stadium ECU, January 11 1968
UA06.04.05.1207
ECU Campus Street Improvements, 1989-03-01T00:00:00+00:00
UA06.04.05.1208
An Addition to Ficklen Stadium ECU, 1967-11-01T00:00:00+00:00
UA06.04.05.1209
School of Art Building, August 25 1972
UA06.04.05.1210
Schedule of Bids Received on the Erection & Completion of Equipment for ECTC, October 9 1923
UA06.04.05.1211
Proposed Reade Street Expansion, January 9 1969
UA06.04.05.1212
Projected Development, ECU, undated
UA06.04.05.1213
ECC, Athletic Fields Development Plan, September 2 1964
UA06.04.05.1214
ECU Campus Map, 1968
UA06.04.05.1215
ECU Campus Map, 1969
UA06.04.05.1216
ECU Campus Map, 1973
UA06.04.05.1217
Infirmary Building for ECTTS, undated
UA06.04.05.1218
Plumbing Improvements: Infirmary, October 2 1954
UA06.04.05.1219
Alterations & Additions to Infirmary, ECC, January 1 1960
UA06.04.05.1220
New Austin Building for East Carolina College, September 20 1960
UA06.04.05.1221
Strength & Conditioning Center, January 14 2000
UA06.04.05.1222
Main Campus Lighting Improvements, 1960-06-01T00:00:00+00:00
UA06.04.05.1223
Steam Plant Upgrade Boilers No. 1 & 2, October 1 1997
UA06.04.05.1224
Alterations to Medical School Facilities, 1986-07-01T00:00:00+00:00
UA06.04.05.1225
ECU Freshman Parking Lot, Dickinson Avenue, December 1 2003
UA06.04.05.1226
ECU Campus Street Improvements, 1989-03-01T00:00:00+00:00
UA06.04.05.1227
Storm Sewer Replacement and Rehabilitation of Core Campus Mall, April 12 2003
UA06.04.05.1228
Proposed Land Use, ECC, February 8 1965
UA06.04.05.1229
ECU, School of Medicine: Phase I, April 4 1977
UA06.04.05.1230
College Drive Street Lights, ECC, June 1 1959
UA06.04.05.1231
Upgrade Academic Building: Blount, November 10 1999
UA06.04.05.1232
Joyner Library Architectural Designs, undated
UA06.04.05.1233
Warren Life Sciences Building - Section A Roof Replacement, October 2018
UA06.04.05.1234
ECU Brody SOM - Replace Refurbish South A & B Elevators, June 13 2019
UA06.04.05.1235
Jenkins Fine Arts Building Elevator Modernization, June 4 2018
UA06.04.05.1236
1397 Warehouse District FO Infrastructure Evans St to Clark St, July 8 2019
UA06.04.05.1237
Mendenhall Steam Distribution System Replacement - North Side, March 23 2018
UA06.04.05.1238
Replacement Condensate and Electrical Utilities at Greenmill Run - Phase 1, July 9 2014
UA06.04.05.1239
HSC Cup Chiller Header Modifications, June 24 2016
UA06.04.05.1240
Athletics Expansion & Improvements: Auxiliary Gym Addition - Volume 2, April 18 2012
UA06.04.05.1241
Austin Building - Replace Sectionalizing Switch #10, December 29 2017
UA06.04.05.1242
HSC Chiller 5 Replacement, January 13 2016
UA06.04.05.1243
Replacement Condensate and Electrical Utilities at Greenmill Run - Phase 2, December 2 2016
UA06.04.05.1244
ECU Health Sciences Campus Steam Distribution Upgrades, April 26 2013
UA06.04.05.1245
Athletics Expansion & Improvements: Auxiliary Gym Addition - Volume 1, April 18 2012
UA06.04.05.1246
Dowdy-Ficklen Stadium Southside Renovation: Plumbing (Ward), March 3 2020
UA06.04.05.1247
Dowdy-Ficklen Stadium Southside Renovation: Electrical (Ward), March 3 2020
UA06.04.05.1248
Dowdy-Ficklen Stadium Southside Renovation: Fire Protection, March 3 2020
UA06.04.05.1249
Dowdy-Ficklen Stadium Southside Renovation: Structure, March 3 2020
UA06.04.05.1250
Dowdy-Ficklen Stadium Southside Renovation: Irrigation Plan, March 3 2020
UA06.04.05.1251
Dowdy-Ficklen Stadium Southside Renovation: Appendix B: Tower, March 3 2020
UA06.04.05.1252
Dowdy-Ficklen Stadium Southside Renovation: Site Electricity, March 3 2020
UA06.04.05.1253
Dowdy-Ficklen Stadium Southside Renovation: Stadium Technology, March 3 2020
UA06.04.05.1254
Dowdy-Ficklen Stadium Southside Renovation: Plumbing (Dowdy-Ficklen), March 3 2020
UA06.04.05.1255
Dowdy-Ficklen Stadium Southside Renovation: Title Pages, Ward, Mechanical & Foundations, March 3 2020
UA06.04.05.1256
Dowdy-Ficklen Stadium Southside Renovation: Electrical (Dowdy-Ficklen), March 3 2020
UA06.04.05.1257
Jones Gallery Renovation, 2020-04-09
UA06.04.05.1258
Renovations to Greene Residence Hall, 2020-01-10
UA06.04.05.1259
Health Sciences Campus Student Services Center, 2017-11-28
UA06.04.05.1260
Floor plans- dormitories, 2009
UA06.04.05.1261
Campus Map, 2000s
UA06.04.05.1262
Janice Hardison Faulkner Gallery/Joyner Library Gallery, undated
Box Oversized 1
Science and Technology Building, 1999-06-17
Box Oversized 1
Revised Planting Plan for East Carolina Teacher's Training School, 1910-12-17
UA06.04.05.1265
East Carolina University Main Campus Student Union Overall Floor Plan Bid Set
, 2016-01-08
UA06.04.05.1266
Wrought Iron Transmission Pole reprint, 1909-08-09
General
DR00236, stored in mapcase 27, drawer 2
UA06.04.05.1267
Mendenhall University Union Radio Room, 1988
stored in mapcase 27, drawer 2
UA06.04.05.1268
Mendenhall University Union Expansion, Level 2 floor plan, 1987
stored in mapcase 27, drawer 2
UA06.04.05.1269
Topographical Survey Mendenhall Student Center, 1986
stored in mapcase 27, drawer 2
UA06.04.05.1270
Student Union, Ground, First, and Second Floors, 1970
stored in mapcase 27, drawer 2
UA06.04.05.1271
Renovation of Wright Building, 1981
stored in mapcase 27, drawer 2
UA06.04.05.1272
Health Science Campus Student Center, 2014-02-03
mapcase 39, drawer 1